Could u pls explanation with example, integration between SD and other modules like PP, CS, PS, MM .....

WarmsRegards,

Rao

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

hi

SD & MM - Possible in Batches, Material Requirement Planning.

SD & PP - Possible in Material Requirement planning.

<a href="http://www.slideshare.net/srinatha/ introduction-to-sap-from-infosys">http://www.slideshare.net/srinatha/ introduction-to-sap-from-infosys</a>

Answers (5)

Answers (5)

Former Member
0 Kudos

Hi Rao,

Please find herewith the SD Module Integrated with FI/CO, MM, PS etc.,

The link between SD and MM: -

1. When you create sales order in SD, all the details of the items are copied from Material master of MM.

2. MRP and availability check related data is also taken from MM although you control this data in SD also.

3. While you create inbound/outbound delivery with reference to a sales order, the shipping point determination takes place with the help of the loading group, plant data, shipping conditions etc. This also refers to Material Master.

4. The material which you are entering in a sales order must be extended to the sales area of your sales order/customer otherwise you cannot transact with this material.

There are many such links between SD and MM.

SD AND MM INTGRATON

1a. Looking at MM and SD interaction first, take the scenario of a third party order process. This process uses a purchase order (which is sent to your vendor). Also invoice verification is used further along the process to check that the invoice you send to your customer is the same material and quantity as that which the vendor sends to you (but obviously shipped

directly to your customer).

1b. Billing is an SD function. But SAP needs to know, when processing a customer's payment, to which GL account the payment has to be processed. For instance payment of a UK based material would be placed in a different GL account to that of a non-UK based material. Furthermore, a UK based customer may have a different GL account to that of an Export customer. This is configured in Account Determination.

2. ABAPers are there to essential do some bespoke development. Your integration, or interaction, with them would be when specifying the tables, fields, input fields, a simple process explanation, data mapping (if doing an interface from one system to another) etc. *-- Shahee

The link between SD and MM :-

1. When you create sales order in SD, all the details of the items are copied from Material master of MM.

2. MRP and availability check related data is also taken from MM although you control this data in SD also.

3. While you create inbound/outbound delivery with reference to a sales order, the shipping point determination takes place with the help of the loading group, plant data, shipping conditions etc. This also refers to Material Master.

4. The material which you are entering in a sales order must be extended to the sales area of your sales order/customer otherwise you cannot transact with this material.

There are many such links between SD and MM

In Pricing we would want to determine the cost of the product

thru VPRS Condition Type. This cost of the material is

picked from the Material Master. How this happens is, if

we would want to determine this cost VPRS in the Sales Order

for Profitability purpose then , all those Item categories

that can appear in a sales order must be activated for

Determine Cost Check box in customizing. That’s one of the SD

MM Integration.

Now the link between SD and FI: -

1. Whenever you create a delivery with reference to a sales order, goods movement takes place in the background. E.g. In case of standard sales order, you create an outbound goods delivery to the customer.

Here movement 601 takes place. This movement is configured in MM. Also, this movement hits some G/L account in FI. Every such movement of good s hits some G/L account.

2. The accounts posting in FI is done with reference to the billing documents (invoice, debit note, credit note etc) created in SD. Thus this is a link between SD and FI

3. Tax determination: In case of a tax determination also, there is a direct link between SD and MM

SD Integration points with other modules

SD module is highly integrated with the other modules in SAP.

Sales Order –

Integration Points Module

•Availability Check - MM

•Credit Check - FI

•Costing - CO/ MM

•Tax Determination - FI

•Transfer of Requirements - PP/ MM

Delivery & Goods Issue –

Integration Points Module

•Availability Check - MM

•Credit Check - FI

•Reduces stock - MM

•Reduces Inventory $ - FI/ CO

•Requirement Eliminated - PP/ MM

Billing -

Integration Points Module

•Debit A/R - FI/ CO

•Credit Revenue - FI/ CO

•Updates G/ L - FI/ CO

(Tax, discounts, surcharges, etc.)

•Milestone Billing - PS

Return Delivery & Credit Memo -

Integration Points Module

•Increases Inventory - MM

•Updates G/ L - FI

•Credit Memo - FI

•Adjustment to A/R - FI

•Reduces Revenue - FI

SD Transaction Code Flow:

Inquiry / Document type IN

Tcode for creation VA11, VA12, VA13. Tables VBAK, VBAP

Quotation / QT

Tcode for creation VA21, VA22, VA23. Tables VBAK, VBAP

Purchase Order PO

Tcode for creation ME21, ME22, and ME23. Tables EKKO, EKPO.

Sales Order OR

Tcode for creation VA01, VA02, VA03. Tables VBAK, VBAP

Delivery LF

Tcode for creation VL01, VL02, and VL03. Tables LIKP, LIPS

Billing MN

Tcode for creation VF01, VF02, and VF03. Tables VBRK, VBRP

To create a sales order we need purchase order number and customer number. Before that, to create a purchase order we need to have material no, vendor no.

To create vendor tcode is

xk01 (create), xk02 (change), xk03 (display)

Tables are lfa1.

To create customer tcode is xd01, xd02, xd03.

Table is kna1.

in SD area, then the most important process where you really need to know MM area is the third-party process. In this case from SD sales order automatically the purchase requisition will be created on MM side. From this purchase requisition on MM side you create the purchase order on MM side. This purchase order updates the sales order on SD side, if you create the confirmation of the purchase order. This process takes place for the pure third-party as well as for individual purchase order process. Later the invoice will be sent from MM to SD (transaction MIRO) and will update the status of the SD order. If you work with this process then you need really know MM transactions quite well, because it is the same SD and MM system.

Another area where you have SD of one system integrated with MM of another system is the EDI process. Here several remarks concerning EDI concept of SD:

EDI concept is intended to realize the sales and distribution process completely automatically with the help of electronically documents. These documents are sent from one customer to another, are processed mostly on the background and give a possibility to realize the sales process extremely efficiently.

If MM-customer would like to purchase the goods then he creates the IDOC of type ORDERS and send it to SD-customer. On the SD-side the IDOC is processed via the function module IDOC_INPUT_ORDERS and creates the sales order. As confirmation the SD-side can send to MM-side the Order-Response IDOC (function IDOC_OUTPUT_ORDERS). The MM-customer can every time send a change to the existing order, then on SD side the ORDCHG IDOC will be processed. It can change the order like in VA02. The creation of the invoice can be made via IDOC of message type INVOIC (function IDOC_OUTPUT_INVOIC).

So, the process can be realized completely automatically between SD and MM partners with the help of IDOCs: ORDERS, ORDCHG, ORDRSP, INVOICE.

Additional processes in SD, where EDI are used in communication with MM are:

1) sending (from MM side) and application (on SD side) of delivery schedules to the scheduling agreement: IDOC of type DELINS. In this case we have practically automatically communication between SD and MM scheduling agreements via IDOCs;

2) creation of credit advice / credit memo in the frames of self-billing: IDOCs of type GSVERF, SBWAP and for external invoice creation SBINV are sent from MM customer to SD customer. So, the output function module belongs to MM area and the inbound function module - to SD area.

PS - SD INTGRATON

PS SD integration happens during Milestone billing...

Below is whole process-

Billing Plan for Milestone Billing

Milestone billing means distributing the total amount to be billed over multiple billing

dates in the billing plan.

As each milestone is successfully reached, the customer is billed either a percentage of

the entire project cost or simply a pre-defined amount.

During sales order processing, the system determines from the item category whether a

billing plan is required and, if so, which type of plan

The type of billing plan that is determined at this point is set up in Customizing and

cannot be changed in the sales document.

Billing plans for periodic billing and milestone billing plans for project-related milestone

billing have different overview screens so that you can enter data relevant to your

processing.

For example, for milestone billing, you must be able to enter data to identify the

individual milestones.

IMG configuration requires:-

1. Maintain billing plan types for milestone billing in OVBO.

2. Define date description in SM30 - V_TVTB.

3. Maintain Date Category for Billing Plan Type IN OVBJ.

4. Allocate date category in SM30 - V_TFPLA_TY.

5. Maintain date proposal for Billing Plan Type in OVBM.

6. Assign Billing Plan Type to Sales Documents Type in OVBP.

7. Assign Billing Plan Type to Item Categories in OVBR.

8. Define rules for determining the date in OVBS.

Milestone billing is typically used for billing projects, such as plant engineering and

construction projects. Such projects often include a series of milestones that mark the

completion of different stages of the work. In the SAP R/3 System, milestones are defined

in a network along with planned and actual dates for the completion of work. The milestones

are also assigned to the billing dates in the billing plan.

Each milestone-related billing date is blocked for processing until the Project System

confirms that the milestone is completed.

Delivery-relevant order items for which a milestone billing plan applies are billed on the

basis of the requested delivery quantity and not on the total of the confirmed quantities.

The connection between the project and the sales document item is made in the individual

schedule lines of the item. Each schedule item can be assigned to a network in a project.

To display the project-related data for a schedule line, proceed as follows:

In one of the overview screens of the sales document, select

1. Item -> Schedule lines.

2. Mark the schedule line and select Procurement details.

The following figure shows an example of milestone billing where only the Contract have

been billed :

Order Item Turbine 100,000

Billing Plan

Billing date Description % Value Billing Block Milestone Billing Status

01-10-94 Contract 10 10,000 - x x

01-03-95 Assembly 30 30,000 x x

01-04-95 Maintenance 30 30,000 x x

01-05-95 Acceptance 30 30,000 x x

01-06-95 Final invoice .. .. x

Network/Activities

Milestone Estimate Actual

Assembly 01-03-95 01-03-95

Maintenance 01-04-95

Acceptance 01-05-95

For each billing date in a milestone billing plan, you can specify whether the billing

date is:

1. fixed

2. Always updated with the actual date of the milestone

3. Updated with the actual date of the milestone, if the date is earlier than the

planned billing date for the date

Please Reward If Really Helpful,

Thanks and Regards,

Sateesh.Kandula

Manoj_Mahajan78
Active Contributor
0 Kudos

RAO,

1. In SAP you will always get integration with other modules. SD will interact with FI, MM will interact with SD :-

1a. Looking at MM and SD interaction first, take the scenario of a third party order process. This process uses a purchase order (which is sent to your vendor). Also invoice verification is used further along the process to check that the invoice you send to your customer is the same material and quantity as that which the vendor sends to you (but obviously shipped

directly to your customer).

1b. Billing is an SD function. But SAP needs to know, when processing a customer's payment, to which GL account the payment has to be processed. For instance payment of a UK based material would be placed in a different GL account to that of a non-UK based material. Furthermore, a UK based customer may have a different GL account to that of an Export customer. This is configured in Account Determination.

2. ABAPers are there to essential do some bespoke development. Your integration, or interaction, with them would be when specifying the tables, fields, input fields, a simple process explanation, data mapping (if doing an interface from one system to another) etc.

The link between SD and MM :-

1. When you create sales order in SD, all the details of the items are copied from Material master of MM.

2. MRP and availibility check related data is also taken from MM although you control this data in SD also.

3. While you create inbound/outbound delivery with reference to a sales order,the shipping point determination takes place with the help of the loading group, plant data, shipping conditions etc. This also refers to Material Master.

4. The material which you are entering in a sales order must be extended to the sales area of your sales order/customer otherwise you cannot transact with this material.

There are many such links between SD and MM.

Now the link between SD and FI :-

1. Whenever you create a delivery with reference to a sales order, goods movement takes place in the bacgground. eg. In case of standard sales order, you create an outbound goods delivery to the customer.

Here movement 601 takes place. This movement is configured in MM. Also, this movement hits some G/L account in FI. Every such movement of good s hits some G/L account.

2. The accounts posting in FI is done with reference to the billing documents (invoice, debit note, credit note etc) created in SD. Thus this is a link between SD and FI

3. Tax determination: In case of a tax determination also, there is a direct link between SD and MM

SD Integration points with other modules

SD module is highly integrated with the other modules in SAP.

Sales Order –

Integration Points Module

•Availability Check - MM

•Credit Check - FI

•Costing - CO/ MM

•Tax Determination - FI

•Transfer of Requirements - PP/ MM

Delivery & Goods Issue –

Integration Points Module

•Availability Check - MM

•Credit Check - FI

•Reduces stock - MM

•Reduces Inventory $ - FI/ CO

•Requirement Eliminated - PP/ MM

Billing -

Integration Points Module

•Debit A/R - FI/ CO

•Credit Revenue - FI/ CO

•Updates G/ L - FI/ CO

(Tax, discounts, surcharges, etc.)

•Milestone Billing - PS

Return Delivery & Credit Memo -

Integration Points Module

•Increases Inventory - MM

•Updates G/ L - FI

•Credit Memo - FI

•Adjustment to A/R - FI

•Reduces Revenue - FI

REWARD POINTS IF U FINDS THIS AS USEFUL...

Regds

MM

Manoj_Mahajan78
Active Contributor
0 Kudos

RAO,

1. In SAP you will always get integration with other modules. SD will interact with FI, MM will interact with SD :-

1a. Looking at MM and SD interaction first, take the scenario of a third party order process. This process uses a purchase order (which is sent to your vendor). Also invoice verification is used further along the process to check that the invoice you send to your customer is the same material and quantity as that which the vendor sends to you (but obviously shipped

directly to your customer).

1b. Billing is an SD function. But SAP needs to know, when processing a customer's payment, to which GL account the payment has to be processed. For instance payment of a UK based material would be placed in a different GL account to that of a non-UK based material. Furthermore, a UK based customer may have a different GL account to that of an Export customer. This is configured in Account Determination.

2. ABAPers are there to essential do some bespoke development. Your integration, or interaction, with them would be when specifying the tables, fields, input fields, a simple process explanation, data mapping (if doing an interface from one system to another) etc. *-- Shahee

The link between SD and MM :-

1. When you create sales order in SD, all the details of the items are copied from Material master of MM.

2. MRP and availibility check related data is also taken from MM although you control this data in SD also.

3. While you create inbound/outbound delivery with reference to a sales order,the shipping point determination takes place with the help of the loading group, plant data, shipping conditions etc. This also refers to Material Master.

4. The material which you are entering in a sales order must be extended to the sales area of your sales order/customer otherwise you cannot transact with this material.

There are many such links between SD and MM.

Now the link between SD and FI :-

1. Whenever you create a delivery with reference to a sales order, goods movement takes place in the bacgground. eg. In case of standard sales order, you create an outbound goods delivery to the customer.

Here movement 601 takes place. This movement is configured in MM. Also, this movement hits some G/L account in FI. Every such movement of good s hits some G/L account.

2. The accounts posting in FI is done with reference to the billing documents (invoice, debit note, credit note etc) created in SD. Thus this is a link between SD and FI

3. Tax determination: In case of a tax determination also, there is a direct link between SD and MM

SD Integration points with other modules

SD module is highly integrated with the other modules in SAP.

Sales Order –

Integration Points Module

•Availability Check - MM

•Credit Check - FI

•Costing - CO/ MM

•Tax Determination - FI

•Transfer of Requirements - PP/ MM

Delivery & Goods Issue –

Integration Points Module

•Availability Check - MM

•Credit Check - FI

•Reduces stock - MM

•Reduces Inventory $ - FI/ CO

•Requirement Eliminated - PP/ MM

Billing -

Integration Points Module

•Debit A/R - FI/ CO

•Credit Revenue - FI/ CO

•Updates G/ L - FI/ CO

(Tax, discounts, surcharges, etc.)

•Milestone Billing - PS

Return Delivery & Credit Memo -

Integration Points Module

•Increases Inventory - MM

•Updates G/ L - FI

•Credit Memo - FI

•Adjustment to A/R - FI

•Reduces Revenue - FI

REWARD POINTS IF U FINDS THIS AS USEFUL...

Regds

MM

Former Member
0 Kudos

hi

also do search in the forum can get useful info..

https://forums.sdn.sap.com/click.jspa?searchID=4215092&messageID=3374821

Link Between SAP SD, MM & FI

The link between SD and MM :-

1. When you create sales order in SD, all the details of the items are copied from Material master of MM.

2. MRP and availibility check related data is also taken from MM although you control this data in SD also.

3. While you create inbound/outbound delivery with reference to a sales order,the shipping point determination takes place with the help of the loading group, plant data, shipping conditions etc. This also refers to Material Master.

4. The material which you are entering in a sales order must be extended to the sales area of your sales order/customer otherwise you cannot transact with this material.

There are many such links between SD and MM.

Now the link between SD and FI :-

1. Whenever you create a delivery with reference to a sales order, goods movement takes place in the bacgground. eg. In case of standard sales order, you create an outbound goods delivery to the customer.

Here movement 601 takes place. This movement is configured in MM. Also, this movement hits some G/L account in FI. Every such movement of good s hits some G/L account.

2. The accounts posting in FI is done with reference to the billing documents (invoice, debit note, credit note etc) created in SD. Thus this is a link between SD and FI

3. Tax determination: In case of a tax determination also, there is a direct link between SD and MM

SD Integration points with other modules

SD module is highly integrated with the other modules in SAP.

Sales Order –

Integration Points Module

•Availability Check - MM

•Credit Check - FI

•Costing - CO/ MM

•Tax Determination - FI

•Transfer of Requirements - PP/ MM

Delivery & Goods Issue –

Integration Points Module

•Availability Check - MM

•Credit Check - FI

•Reduces stock - MM

•Reduces Inventory $ - FI/ CO

•Requirement Eliminated - PP/ MM

Billing -

Integration Points Module

•Debit A/R - FI/ CO

•Credit Revenue - FI/ CO

•Updates G/ L - FI/ CO

(Tax, discounts, surcharges, etc.)

•Milestone Billing - PS

Return Delivery & Credit Memo -

Integration Points Module

•Increases Inventory - MM

•Updates G/ L - FI

•Credit Memo - FI

•Adjustment to A/R - FI

•Reduces Revenue - FI

Tips by: Subha

SD Transaction Code Flow:

Inquiry / Document type IN

Tcode for creation VA11,VA12,VA13. tables VBAK,VBAP

Quotation / QT

Tcode for creation VA21,VA22,VA23. tables VBAK,VBAP

Purchase Order PO

Tcode for creation ME21,ME22,ME23. tables EKKO,EKPO.

Sales Order OR

Tcode for creation VA01,VA02,VA03. tables VBAK,VBAP

Delivery LF

Tcode for creation VL01,VL02,VL03. tables LIKP,LIPS

Billing MN

Tcode for creation VF01,VF02,VF03. tables VBRK,VBRP

To create a sales order we need purchase order number and custmer number. Before that, to create a purchase order we need to have material no, vendor no.

To create vendor tcode is

xk01(create), xk02(change) , xk03(display)

Tables are lfa1.

To create custmer tcode is xd01, xd02, xd03.

Table is kna1.

After creating sales order using this no we can create delivery note tcode is vl01.

Reward if USeful

Thanx & regrads

naren..

Former Member
0 Kudos

Hi,

The link between SD and MM: -

1. When you create sales order in SD, all the details of the items are copied from Material master of MM.

2. MRP and availability check related data is also taken from MM although you control this data in SD also.

3. While you create inbound/outbound delivery with reference to a sales order, the shipping point determination takes place with the help of the loading group, plant data, shipping conditions etc. This also refers to Material Master.

4. The material which you are entering in a sales order must be extended to the sales area of your sales order/customer otherwise you cannot transact with this material.

There are many such links between SD and MM.

SD AND MM INTGRATON

1a. Looking at MM and SD interaction first, take the scenario of a third party order process. This process uses a purchase order (which is sent to your vendor). Also invoice verification is used further along the process to check that the invoice you send to your customer is the same material and quantity as that which the vendor sends to you (but obviously shipped

directly to your customer).

1b. Billing is an SD function. But SAP needs to know, when processing a customer's payment, to which GL account the payment has to be processed. For instance payment of a UK based material would be placed in a different GL account to that of a non-UK based material. Furthermore, a UK based customer may have a different GL account to that of an Export customer. This is configured in Account Determination.

2. ABAPers are there to essential do some bespoke development. Your integration, or interaction, with them would be when specifying the tables, fields, input fields, a simple process explanation, data mapping (if doing an interface from one system to another) etc. *-- Shahee

The link between SD and MM :-

1. When you create sales order in SD, all the details of the items are copied from Material master of MM.

2. MRP and availability check related data is also taken from MM although you control this data in SD also.

3. While you create inbound/outbound delivery with reference to a sales order, the shipping point determination takes place with the help of the loading group, plant data, shipping conditions etc. This also refers to Material Master.

4. The material which you are entering in a sales order must be extended to the sales area of your sales order/customer otherwise you cannot transact with this material.

There are many such links between SD and MM

In Pricing we would want to determine the cost of the product

thru VPRS Condition Type. This cost of the material is

picked from the Material Master. How this happens is, if

we would want to determine this cost VPRS in the Sales Order

for Profitability purpose then , all those Item categories

that can appear in a sales order must be activated for

Determine Cost Check box in customizing. That’s one of the SD

MM Integration.

Now the link between SD and FI: -

1. Whenever you create a delivery with reference to a sales order, goods movement takes place in the background. E.g. In case of standard sales order, you create an outbound goods delivery to the customer.

Here movement 601 takes place. This movement is configured in MM. Also, this movement hits some G/L account in FI. Every such movement of good s hits some G/L account.

2. The accounts posting in FI is done with reference to the billing documents (invoice, debit note, credit note etc) created in SD. Thus this is a link between SD and FI

3. Tax determination: In case of a tax determination also, there is a direct link between SD and MM

SD Module is integrated with various modules during transaction processing ...

Sales Order – Integration Points Module

•Availability Check MM •Credit Check FI •Costing CO/ MM •Tax Determination FI •Transfer of Requirements PP/ MM

Delivery & Goods Issue – Integration Points Module

•Availability Check MM •Credit Check FI •Reduces stock MM •Reduces Inventory $ FI/ CO •Requirement Eliminated PP/ MM

Billing - Integration Points Module

•Debit A/R FI/ CO •Credit Revenue FI/ CO •Updates G/ L FI/ CO (Tax, discounts, surcharges, etc.) •Milestone Billing PS

Return Delivery & Credit Memo - Integration Points Module

•Increases Inventory MM •Updates G/ L

FI •Credit Memo FI •Adjustment to A/R FI •Reduces Revenue FI

If you work in SD area, then the most important process where you really need to know MM area is the third-party process. In this case from SD sales order automatically the purchase requisition will be created on MM side. From this purchase requisition on MM side you create the purchase order on MM side. This purchase order updates the sales order on SD side, if you create the confirmation of the purchase order. This process takes place for the pure third-party as well as for individual purchase order process. Later the invoice will be sent from MM to SD (transaction MIRO) and will update the status of the SD order. If you work with this process then you need really know MM transactions quite well, because it is the same SD and MM system.

Another area where you have SD of one system integrated with MM of another system is the EDI process. Here several remarks concerning EDI concept of SD:

EDI concept is intended to realize the sales and distribution process completely automatically with the help of electronically documents. These documents are sent from one customer to another, are processed mostly on the background and give a possibility to realize the sales process extremely efficiently.

If MM-customer would like to purchase the goods then he creates the IDOC of type ORDERS and send it to SD-customer. On the SD-side the IDOC is processed via the function module IDOC_INPUT_ORDERS and creates the sales order. As confirmation the SD-side can send to MM-side the Order-Response IDOC (function IDOC_OUTPUT_ORDERS). The MM-customer can every time send a change to the existing order, then on SD side the ORDCHG IDOC will be processed. It can change the order like in VA02. The creation of the invoice can be made via IDOC of message type INVOIC (function IDOC_OUTPUT_INVOIC).

So, the process can be realized completely automatically between SD and MM partners with the help of IDOCs: ORDERS, ORDCHG, ORDRSP, INVOICE.

Additional processes in SD, where EDI are used in communication with MM are:

1) sending (from MM side) and application (on SD side) of delivery schedules to the scheduling agreement: IDOC of type DELINS. In this case we have practically automatically communication between SD and MM scheduling agreements via IDOCs;

2) creation of credit advice / credit memo in the frames of self-billing: IDOCs of type GSVERF, SBWAP and for external invoice creation SBINV are sent from MM customer to SD customer. So, the output function module belongs to MM area and the inbound function module - to SD area.

Sam