Hi,

I have the BOM material which is exploreing in the sales order 11005 as

follows -

LineItem Railing 10 (Top Material)

01 A01 10

02 A02 10 (Sub items)

03 A03 10

04 A04 10

05 A05 10

At the time of sales order level, we are sending the requirements to

PPC for the top material Railing, at the time produciton stage PP run

the MRP and do the production for Sub items A01 to A05. When doing the

production confirmation for A01 to A05 materials, system is confirming

the stock against the sales order number 11005 with item no 01.

In our business purpose we are maintaining the stock for top material

and also sub itmes because of Excise purpose. For Top material we are

uploading stock manually with MB1C with Special Stock E and in PPC

doing the produciton of sub items.

At the time of crating the delivery system is not checking stock of sub

items and its showing the stock as 0 because the proudction is

confirmed at line item 10 for sub items a01 to a05.

Reply ASAP

Regards

Goutham

+919891936656

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Friends,

Can you please provide the solution for my problem and its slight urgent.

Regards

Goutham