cancel
Showing results for 
Search instead for 
Did you mean: 

ALE

Former Member
0 Kudos

Hello Friendz.

what is ALE and how it is implemented in sap xi.

Thank you

Accepted Solutions (0)

Answers (5)

Answers (5)

Former Member
0 Kudos

Hi ravi refer this thread for

<b> Integration of ALE and SAP XI </b>

<b> Diff beteen EDI/ALE in R3 and SAP XI </b>

<b> ALE/XI </b>

<b> ALE vs XI </b>

diffe XI/ALE/EDI

Regards

Abhishek Agrahari

Former Member
0 Kudos

Hi

Read the Document ALE.

Thanks

Shabarish_Nair
Active Contributor
0 Kudos

http://www.thespot4sap.com/Articles/SAP_ALE_Introduction.asp

Read thru to help u understand ALE concepts.

Former Member
Former Member
0 Kudos

Hi

Sent me your mail id.

Thanks

Former Member
0 Kudos

ravi.chandragiri@gmail.com

Message was edited by:

ravi kumar chandragiri

Former Member
0 Kudos

Hi ravi..

Refer this blog by APARNA...

/people/aparna.chaganti2/blog/2007/02/06/xi-or-alewhich-one-is-better

help you....

Kumar.S

Former Member
0 Kudos

Hi ravi

ALE :Application Link Enabling

below is the process for ALE configuration

ALE STEPS FOR XI AND R/3

SAP XI

1) RFC Destination (SM59)

a) Choose create.

b) Specify the name of the RFC destination

c) Select connection type as 3 and save

d) In the technical settings tab enter the details SAP SID/URL and system number#.

e) Enter the Gateway host as same details above SID/URL.

f) Gateway service is 3300+system number#.

g) In the Logon /Security tab, enter the client user & Password details of Destination system.

h) Test the connection and remote logon.

2) Create Port (IDX1)

a) Select create new button

b) Enter the port name as SAP+SID (The starting char should be SAP)

c) Enter the destination client.

d) Enter the RFC Destination created in SAP R/3 towards other system.

e) Save

3) Load Meta Data for IDOC (IDX2)

a) Create new

b) IDOC Message Type

c) Enter port created in IDX1.

SAP R/3

1) RFC Destination (SM59)

a) Choose create.

b) Specify the name of the RFC destination

c) Select connection type as 3 and save

d) In the technical settings tab enter the details SAP SID/URL and system number#.

e) Enter the Gateway host as same details above SID/URL.

f) Gateway service is 3300+system number#.

g) In the Logon /Security tab, enter the client user & Password details of Destination system.

h) Test the connection and remote logon.

2) Create Port (We21)

a) First Select Transactional RFC and then click create button

b) Enter the destination port name as SAP+SID (The starting char should be SAP)

c) Enter the destination client.

d) Enter the RFC Destination created in SAP R/3 towards other system.

e) Save

3) Create Partner Profile (WE20)

a) Create New

b) Create the Partner no. name as same the logical system name of the destination system.

c) Select Partner type LS

d) Enter details for Type: US/USER, Agent, and Lang.

e) Click on the + button to select the message type.

f) Select Partner no. and LS which ever create above.

g) Select Message type

h) Select Process code related to the Message type.

I) save.

In SLD – System Landscape Directory

TS for R/3 (Logical system):-Assign the client name created in R/3 as Logical system Name.

Ts for Third Party (Logical system):-

BS for SAP R/3 (Logical system):- Assign the client name created in R/3 as Logical system Name.

BS for Third Party (Logical system):-Enter the XI logical system name.

cheers

kish

reward points if helpful