on 08-24-2007 4:10 AM
In our DP project we have found that there are some changes that would be required in the basic property of the key figures for example (zero allowed) after we have already gone live with the system. We are working on the scm 5.0 and it does provide the functionality of changing the properties of the key figure without the deinitializing the planning area. Does any one have tried it out to make changes in the basic characteristic of the key figure in the dev box and importing the same in a running production box.
What do u think could be the risk run in this situation.
Thanks
Ashwini
Hi
This should not be a problem
I have done this. But mine was accompanied with an upgrade as well
Retransport the Planning area and the Planning book with the Keyfigures again and it should replace the existing PA.
Obviously you will have backed up the data. (Zero allowed should not be an issue am not sure what happens when you do it the other way round... what happens to the negatives)
The easy way to check this to be doubly sure is to
a) create a small planning area wikth one KF you will not use and transport it to Prod . then change the KF and transport it to prod and test
b) if it works from Dev to QA, it should work from QA to Prod
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
8 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.