cancel
Showing results for 
Search instead for 
Did you mean: 

How to build other report in internal order std rpt(S_ALR_81012293)

Former Member
0 Kudos

Hi,

Currently, in the internal order std report, we can only view actual against plan for a range of period. We would like to build under other report(CtrlShiftF1), one that we can at a glance breakdown by different periods. This means that in the same report, I can toggle between the 2 views.

How can we do it?

Thanks,

CW

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

RUN the report and find what report group it belongs. Create the new report and assign it to the same report group. this should solve your problem. I think the report group is 6000. Use the transaction code GR52 to assign this report to the report group

Assign points if helpful

Former Member
0 Kudos

If you mean CtrlshiftF11, which gives you the time period report, you can select Limited reporting, specify one period and then page through the periods.

If you want to see two that are not consecutive with a toggle, you could always open a second session and follow the same steps and veiw the second period that you are interested in.

Althea