Hello All
Please let me know the procedure for calculating material avail date.
my probelm
Two order are created on the same day from same plant but having different Material avail date.
solution was very useful
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Srikanth,
Material Availability date is calculation field. When system calculate the availability of the material on a requested delivery date, it will consider different lead times into consideration. there are two strategies available called Backward scheduling and Forward Scheduling.
For examplet today you are creating an order and requested delivery date is say 30.08.2007. For the system to confirm the schedule line on 30th, first it will do backward scheduling to arrive at Material availability date. Say we have different lead times like pick time, pack time, load time, transit time etc. for about 8 days. Then starting from the 30.08 system will count back wards i,e 30-8 = 22.08. On 22nd August material should be available in the plant to confirm the delivery date on 30th. This is called material availbility date. If the material is not available on 22nd then system will do forward scheduling to confirm the delivery date. In process of this it will consider ATP settings.
Hope this will help you
Regards,
Ravikiran Pochiraju
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
mat avilable date will be based on del scheduling calculated backward from requested delivery date wich include pick/pack time, loading time(both from shipping point) and transpotation lead time , transit time from route.
if mat avilable date systcomes before order preparation date then system will confirm the sh line with forward scheduling
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
dear srikanth,,
for this you should know about availability check, that how system is calculating the for the date.
Availability Check: 02 individual requirement
It is a checking group for availability check.
The value of this field defines weather system has to carry out TOR (Transfer of Requirement) and Availability Check
If the system hast to carry out availability check then it determines what kind of MRP elements
(Purchase requisition, P.O) including in availability check
It also determines weather availability check carrys out until the Replenishment Lead Time
or it should check over the entire period of MRP elements.
It also determines what kind of requirements it has to generate
Those are 1. Individual requirements 2. Collective requirements
If this material placed in an order or delivery.
a) Individual requirements:
In individual requirement system creates MRP records for each schedule line of the material.
b) Collective requirements:
In collective requirements system creates MRP records collectively ex: weekly once
When the business generates number of sales orders per day collective requirements are advisable.
c) RLT the time that business requires to procure the material internally or externally
Together with checking rule, this checking group controls availability check.
reward points
siva
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Go to MMBE and see the stock which you have entered in the order and see the stock available there.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
91 | |
11 | |
10 | |
6 | |
5 | |
5 | |
5 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.