Costing sheet

Hi all

I have created two costing sheets with seperate

costing variants, but when ever i change the percentages of overhead

or credit, it is updating in the second one also.

where now the requirement is like that, where i have to create the 40

costing sheets for the each factory for different overhead rates. How

can i do this, if the thing is happening as above mentioned.

Please tell me is there any thing i need to do, specifically for creating the

different costing sheets with different costing variants (1 to 1

basis) for calculating the OH as per the factory wise.

Thanks

Ansuman