on 08-20-2007 8:09 AM
How storage location is locked with respect to material type?
Dear,
You can make storage loc del flag for a material, plant and storage loc level in MM06.
or delte the same in MMSC.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Debasish,
you cant lock SL with respect to Material type.
You can exclude from MRP planning
you can delete with respect to material any storage location.
Thanks
Bala
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
94 | |
11 | |
10 | |
6 | |
5 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.