Dear Gurus

when i am going to create the bom in which total 7 component are there.but out of 7,three components are alternative of each other,suppose A,B and C are these components whose uom is kg. i have alredy defiened these components in bom with minimum quantity 0.1 kg,but i have to replace quantity with zero but it is not accepting.is there any setting where i can give quantity zero duing creating BOM.

thanks

kk

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi Kedar,

When qnty is 0 then why we need to add in BOM ???

you can enter that in production order, you can change qnty or delete in change order Co02 in component view

Thanks

Bala

Former Member
0 Kudos

Hi Kedar

Quantities cannot be zero in bom, it the 3 component materials are alteranative materials use alternative item group. using this u can select either of the materials while doing the GI.

U have 2 strategies in this

1. By usage probability: in this case u give usage probability of this material and this material is used in that % while doing GR

2. By 100% check: in this case it uses the component which is 100% available.