Hi all gurus out there,
We are trying to implement confirmation approval workflow in our SRM system. Our SRM version is SRM 3.0 or EBP 4.0 and we are operating in extended classic scenario.
We implement the approval workflow WS10400002 (1-step approval) and WS10400010 (no approval). WS10400002 is used in situation when an administrator does the confirmation and will go to the requestor for approval. Here, when the requestor approves the confirmation, the status is updated correctly to 'Approved' but no goods receipt is triggered by the system. We looked at the workflow and found that there is no task/activity to do the post goods receipt in the backend system.
Can someone please confirm whether these are the correct workflows that I should be using and that it is not a bug? I just want to make sure it is not as a result of a standard limitation before going back to SAP.
Cheers!
Siow Fong
Hi Guys,
I checked with SAP on this and found out that the standard codes would have created the goods receipt. This creation is no longer coded in the workflow itself (like the old workflow used to be). The reason why it was not working for us was a piece of code being added that prevented the creation of the goods receipt.
Regards
Siow Fong
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sion,
GR would be posted to backend through Idocs . Check you have maitained the distribution model correctly with message type MBGMCR.
Best regards
Iftekhar Alam