Item Category and MRP type for material is not allowed

Former Member
0 Kudos

Hello all,

I got a Error Message:

<b>Transaction Z113 is not defined (Message no. V1347)</b>

<b>Diagnosis</b>

This combination of item category Z113 and MRP type for material is not allowed.

<b>System response</b>

The system does not allow further processing of this item.

<b>Procedure</b>

Check your entry.

You can display the combination defined in table TVEPZ, which controls scheduling line category determination, and change it as required if you have the authorization to do so. The MRP type for the material may be changed in the material master.

<b>The SD Configuration seems all right, I have:</b>

Sls Doc Type (<b>VOV8</b>) – ZA9 (no delivery type assigned)

Item Category (<b>VOV7</b>) – Z113

Assigs Sls Doc & Item Ctgry (<b>VOV4</b>) – ZA9/ZNOR/blank/blanl/Z113

ZNOR = Std Item-Av. chck Del

ZNOR defined in MM03/Sls Org 2

Define Schedule Line (<b>VOV6</b>) = Z7 (without delivery)

Z7 has FLAG on Prod Allocation

Assign Schedule Line (<b>VOV5</b>) = Z113/ND/Z7

At table: TVEPZ

I have the entry: Z113/ND/Z7

Guys, what would?

Please help me out because I am stuck in this issue.

Thanks a lot,

Barbara

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Can you please verify the MRP type maintained for the material you are using in material master.

Goto MM03->MRP 1 Tab

and check entry in MRP Type field.

For example if MRP type field in material master is M1,

Then in table: TVEPZ maintain the following entry

: Z113/M1/Z7

<b>Reward if helpful.</b>

Thanks

Answers (2)

Answers (2)

Former Member
0 Kudos

Barbara, this may be tied to Strategy Group on the Material Master (I can't read enough into the detail)

Item Category determination + MRP Type for your schedule line type ties to a Sched. Line category(this you know)

New Rqmts class gets tied to a Rqmts Type

New Rqmts Type gets assigned to rqmts class

Strategy, assign the Rqmts Type to it

Strategy Group, Assign the Strategy to it

MM02 [MRP3 view] strategy group should be the one that ties together (all the other ties

It may be something in this area that you need to trace through ?

Bill

Former Member
0 Kudos

Check the MRP type in your MM03 ...then go to schedule line and assign Z113/(mrp type)/Z7

Thanks