on 08-13-2007 7:15 PM
Hello all,
I got a Error Message:
<b>Transaction Z113 is not defined (Message no. V1347)</b>
<b>Diagnosis</b>
This combination of item category Z113 and MRP type for material is not allowed.
<b>System response</b>
The system does not allow further processing of this item.
<b>Procedure</b>
Check your entry.
You can display the combination defined in table TVEPZ, which controls scheduling line category determination, and change it as required if you have the authorization to do so. The MRP type for the material may be changed in the material master.
<b>The SD Configuration seems all right, I have:</b>
Sls Doc Type (<b>VOV8</b>) ZA9 (no delivery type assigned)
Item Category (<b>VOV7</b>) Z113
Assigs Sls Doc & Item Ctgry (<b>VOV4</b>) ZA9/ZNOR/blank/blanl/Z113
ZNOR = Std Item-Av. chck Del
ZNOR defined in MM03/Sls Org 2
Define Schedule Line (<b>VOV6</b>) = Z7 (without delivery)
Z7 has FLAG on Prod Allocation
Assign Schedule Line (<b>VOV5</b>) = Z113/ND/Z7
At table: TVEPZ
I have the entry: Z113/ND/Z7
Guys, what would?
Please help me out because I am stuck in this issue.
Thanks a lot,
Barbara
Hi,
Can you please verify the MRP type maintained for the material you are using in material master.
Goto MM03->MRP 1 Tab
and check entry in MRP Type field.
For example if MRP type field in material master is M1,
Then in table: TVEPZ maintain the following entry
: Z113/M1/Z7
<b>Reward if helpful.</b>
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Barbara, this may be tied to Strategy Group on the Material Master (I can't read enough into the detail)
Item Category determination + MRP Type for your schedule line type ties to a Sched. Line category(this you know)
New Rqmts class gets tied to a Rqmts Type
New Rqmts Type gets assigned to rqmts class
Strategy, assign the Rqmts Type to it
Strategy Group, Assign the Strategy to it
MM02 [MRP3 view] strategy group should be the one that ties together (all the other ties
It may be something in this area that you need to trace through ?
Bill
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Check the MRP type in your MM03 ...then go to schedule line and assign Z113/(mrp type)/Z7
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.