cancel
Showing results for 
Search instead for 
Did you mean: 

kanban

Former Member
0 Kudos

could someone explain to me the Kan ban concept in SD and itss settings in SD

regards

maddy

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos
Former Member
0 Kudos

u can also forward me data n jimmy_ahuja@hotmail.com

Former Member
0 Kudos

hi

<b>KANBAN</b>:

A procedure for controlling production and material flow based on a chain of operations in production and procurement.

The replenishment or the production of a material is not triggered until a certain production level actually requires the material.

The signal for replenishment is issued by a card (kanban) that is sent by a consumer to the supplier.

For further info Refer to links Below

http://help.sap.com/erp2005_ehp_02/helpdata/en/7b/cd0778133c11d393870000e8214d78/frameset.htm

some gud links on web

http://help.sap.com/bp_bblibrary/470/HTML/A07_KANBANAuto_EN_US.htm

http://www50.sap.com/businessmaps/0B1413F015B44089986DF106C5B80C00.htm

http://erp.esworkplace.sap.com/socoview(bD1lbiZjPTgwMCZkPW1pbg==)/smdisplay.asp?id=438056E32CCA465D9...

Reward if USeful

Thanx & regards..

Naren..

Former Member
0 Kudos

HI

refer below

http://help.sap.com/bp_bblibrary/470/HTML/A07_KANBANAuto_EN_US.htm

http://erp.esworkplace.sap.com/socoview(bD1lbiZjPTgwMCZkPW1pbg==)/smdisplay.asp?id=8D9E5750B59511DA2...

http://erp.esworkplace.sap.com/socoview(bD1lbiZjPTgwMCZkPW1pbg==)/smdisplay.asp?id=438056E32CCA465D9...

Purpose

The SAP System can use many procedures to implement KANBAN.

You may require different KANBAN processes depending on the structure of your company and on the way you need to implement KANBAN production control.

Features

In the SAP system, the following procedures are available:

KANBAN with SD Delivery Locate the document in its SAP Library structure

Use

Usually you supply your own production via KANBAN. Now you have the possibility to deliver a kanban directly to your customer via an SD scheduling agreement.

In this process you receive a KANBAN call from your customer. First of all you procure the desired material via KANBAN from your goods issue storage location for example, and then you deliver it to your customer.

Prerequisites

&#9679; You have created an SD scheduling agreement with a delivery block for the delivery due list (in the standard system SAP uses 08 'KANBAN delivery').

&#9679; You have created a status sequence in which the IN USE status is a required status.

&#9679; You have created a replenishment strategy in Customizing for KANBAN that plans the process via KANBAN with SD.

Note

You can use this process for all replenishment strategies (external procurement, in-house production and stock transfer).

&#9679; You have created a KANBAN control cycle for this material with the above mentioned replenishment strategy and entered the scheduling agreement number and item in the control cycle under Sequential Control.

Actions

...

1. You receive a KANBAN call from the customer (by fax for example).

2. From the KANBAN menu you choose Control ® Kanban signal ® KANBAN call. In addition enter the requested quantity. Save your entries.

Note

If you receive the message via EDI, then the system automatically determines the scheduling agreement and processes the requested quantity.

3. The system sets the kanban to EMPTY.

4. In this way the usual KANBAN process begins and the requested quantity is procured, depending on the replenishment strategy.

5. You set the kanban to FULL as soon as the kanban quantity has been procured.

6. The system posts the kanban quantity to the supply area, which you have entered in your control cycle and which serves, in this case, as a goods issue warehouse.

7. a) If you have selected indicator 1, then the system creates a delivery when the kanban is set to FULL. As soon as the kanban has the status IN USE, the system posts the goods issue.

b) If you have set the indicator 2, then the system only creates delivery if the kanban is IN USE. The goods issue must be posted ma

http://help.sap.com/erp2005_ehp_02/helpdata/en/cb/7f8aae43b711d189410000e829fbbd/frameset.htm