cancel
Showing results for 
Search instead for 
Did you mean: 

Model Mix planning

Former Member
0 Kudos

Hello all,

We are in the Blueprint phase of the Project for a Heavy Engineering Manufacturing client.

We are Exploring the option of using Model Mix planning in APO.

We have some few queries:

1-We are thinking of Using Model MiX Planning with standard Variant Configuration in R/3.Can we run MMP with Standard VC or does it require a IPPe?

2.Can we Use Discrete Manufacturing with Model mix planning?I mean can we convert Planned orders generated out of Model Mix planning into Production Orders?

Thanks in Advance

Guru

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

1-We are thinking of Using Model MiX Planning with standard Variant Configuration in R/3.Can we run MMP with Standard VC or does it require a IPPe?

You will able to use standard VC.

2.Can we Use Discrete Manufacturing with Model mix planning?I mean can we convert Planned orders generated out of Model Mix planning into Production Orders?

Yes,

Please check the details of building block : http://help.sap.com/bp_scmv150/BBLibrary/documentation/S28_BB_ConfigGuide_EN_DE.doc

Answers (0)