on 08-08-2007 4:11 PM
I am trying to get quota arrangements in SCM 5.0 to work correctly. We are integrated with ECC 6.0 but we do not use ECC 6.0 for quota arrangements. Thus, I am trying to use only APO to split the requirements in accordance with the percentage set in the quota arrangement. So far, I have created the arrangement in APO at 70/30. However, when I run heuristics, I get 50/50 between the two locations. Is there config somewhere else that I need to maintain in APO? In R/3, I know the other config that must be done but I can not find the same config in APO.
Thanks
Thanks.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Quota Arrangements can't be transfered from ECC to APO via CIF. One stupid check to ask, did you maintain inbound or outbound quota arrangement? (or Inhouse production ) ?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
7 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.