During multilevel controlling I am getting the following error:

Internal error: calling costing leads to exception

when I checked inside controlling cockpit (tcode cocpcpr), I see the following errors:

<b>Contents of field FUNC_AREA/Functional Area are to be modified, either by substitution or batch input.

Because the system noted that a field was not ready for input no chnage was allowed</b>

<b>Errors occurred during the determination of the account assignment in the account assignment manager. Thus it is not possible to determine the account assignment</b>

Can someone help me out in resolving the problem? I have maintained the controlling scenario and also I have mapped a cost variant to the controlling scenario.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

I have solved on this on my own.

The following was the problem:

The standard cost accounting was inactive for the project profile.