on 08-07-2007 9:57 AM
Hi
Currently we have 4.7 E with oracle 9.2.0.4.0. I am trying to perform a system copy from the source (old)production system to the target(new)production system. Please provide me assistance so that we could proceed further. Also send us the coresponding links
Regards
Karthikeyan S
Hi,
<a href="http://sap.ittoolbox.com/documents/popular-q-and-a/how-to-make-a-system-copy-2527">Here's</a> the step by step procedure for System Copy. This will solve your problem.
Feel free to revert back.
--Ragu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
The problem is fixed by updating the kernel
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Raghu
Thanks for your earlier response.
Let me explain the Scenario, currently we are using SAP 4.7 E wiht oracle 9.2 in HP-Unix 11 Ver 1. But we are Planning to upgrade our hardware(server) ans also we are planning to upgrade the OS from ver1 to ver 2 and also the oracel 9.2 to be upgraded to 10g. Since we not changing our OS and DB can follow homogeneous system copy.
Is there any other method to follow for this Scenario, Waiting for your comments.
Regards
Karthikeyan S
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
87 | |
23 | |
11 | |
9 | |
8 | |
5 | |
5 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.