on 08-01-2007 3:47 PM
Hi!
I have SOLMAN 4.0 and have connected two business systems via RFC and generate for these systems EWA.
One system is SRM 5.0 and another is R/3 4.7
I have seen that the EWA for R/3 4.7 are overdue, it means some errors occured.
I have seen one of the errors are wrong <b>SAPNET_RFC connection</b>.
<b>Where do I define this connection with wich user?
On SOLMAN or on R/3 4.7?
Should this connection be similar to SDCC_OSS?</b>
<b>Is there a general approach to track/analyse the problems occured by missing EWA report send to SOLMAN?</b>
Thank you very much indeed
regards
Axel,
The connection SAPNET_RFC needs to exist in both systems as it is required for Earlywatch Reports.
Use transaction SDCCN or report RTCCTOOL.
- Tom
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Axel,
You can create SAPNET_RFC as copy if SDCC_OSS .If there is a problem with SAPNET_RFC, it should be deleted and recreated. If SDCC_OSS tests ok ( Utilities -> Test -> Authorisation) in SM59, SAPNET_RFC can be created as a manual copy of SDCC_OSS. Check note 763561 for more details
Thanks
Prince Jose
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi!
Many thanks for your response.
The question still is: do I need this connection and- if yes- where?
In Solution Manager system or in Business System?
E.g. I have discovered one SAPNET_RFC in Business system which refers to CSN and is wrong. So I have copied the SDCC_OSS as you described to the new SAPNET_RFC.
I hope it helps...
Thank you
User | Count |
---|---|
87 | |
10 | |
10 | |
9 | |
7 | |
7 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.