on 07-26-2007 6:19 AM
anybody please explain me in detail how to create sample drawing procedure.
plesae explain in details how i will have to proceed as i have never used the tcode.
Sampling Drawing Procedure is a master data object in which you plan the drawing of physical samples. In the sample-drawing procedure, we need to specify:
Which categories of physical samples must be drawn
How many physical samples must drawn
The size of each physical sample
Whether the drawing of physical samples must be confirmed
Use
The system uses the information in the sample-drawing procedure together with the information in the inspection plan to calculate the physical sample sizes, and to create physical-sample records when an inspection lot is created.
Structure
A sample-drawing procedure contains the following types of information:
Header data
The sample drawing header contains the following information fields and control indicators:
Key that identifies the sample-drawing procedure
Short text description for the sample-drawing procedure
Authorization group that limits the access to the sample-drawing procedure
Text for matchcode searches
Long text indicator
Indicator for calculating the number of physical samples on the basis of number of containers in the inspection lot (as opposed to the base unit of measure)
Confirmation indicator to activate or deactivate the confirmation requirement
Lock indicator to prevent the sample-drawing procedure from being used
Usage indicator that shows whether the sample-drawing procedure is currently used in an inspection plan
Sample-drawing item(s)
A sample-drawing item contains specific instructions for creating physical samples with respect to a specific inspection lot container type and specific partial-sample numbers in the inspection plan. In a sample-drawing item, you can also specify:
Which categories of physical samples you want to create (primary samples, pooled samples, and reserve samples)
The physical sample container you use to draw each category of physical sample
A factor to increase the quantity of physical samples to be created (for example, if you need to carry out more than one inspection)
The number of physical samples to be created (fixed number or variable number based on a sampling scheme)
Integration
The sample-drawing procedure interacts with the following planning objects:
Inspection plan
You assign a sample-drawing procedure to an inspection plan to activate the functions for sample management.
Sampling scheme (optional)
If you want the system to determine the number of physical samples automatically on the basis of a sampling scheme, you can reference sampling schemes in a sample-drawing procedure.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
The thread contains the fact that this was answered
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi Mr.Sandip,
Sorry to ask this,
What's this sample drawing procedure?
Which T code you mean?
Plz reply.
Regards
Mangal
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
11 | |
10 | |
6 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.