on 07-13-2007 1:31 PM
Hi All,
Can anyone of you provide me some details or documentation on Multi Level Packaging.
Thanks in advance.
Regards,
Syed Nasir
hi,
Basic Process of how Packing Works
Let's say you want to pack a material shirt_jai in test_pack.
Using MM01, create material type=packaging test_pack
[SPRO]
IMG-Logistics Execution-Shipping-Packing-
Define Packaging Material Types
Let's say JPAC. The settings that I chose:
Plant determ. - Plant is entered manually in handling unit
Pack. matl. cat. - Packaging materials
Generate Dlv. Items - blank
Number assignment - Number range interval 'HU_VEKP'
IMG-Logistics Execution-Shipping-Packing-
Define material group for packaging material
Let's say JGRP
IMG-Logistics Execution-Shipping-Packing-
Define allowed packaging materials
JGRP - JPAC
MM02: Check settings for the materials
First, test_pack
Sales:General/Plant -> Matl. Grp. Pack. Matls: JGRP (Note)
Sales:General/Plant -> Packaging Mat. Type: JPAC (Note)
Basic Data 1 -> Material: JMAT
Then, shirt_jai
Sales:General/Plant -> Matl. Grp. Pack. Matls: JGRP
Sales:General/Plant -> Packaging Mat. Type: -
Basic Data 1 -> Material: JMAT
VL01N Outbound Delivery -> Packing
Enter the materials at top and at bottom
(Select shirt_jai and
Edit - Pack)
This is how the basic process of packing works.
The "Packing Process" with an Example
Example:
You created a order for a material(R-1160 - hard disks) for a qty - 120 pieces.
You need to create a delivery and
A)pack 40 pieces each of the material are grouped together into larger cardboard boxes (PK-100 - shipping/packing material) and
B)these 3 cardboard boxes are put into pallet (PK-095).
Solution:
A)Packing 40 pieces each of material (40 x 3 = 120 pieces)
1)Goto [VL02N] to change the delivery, you already created.
Or you can do the following steps while you are creating a delivery also.
2)Go to "pack" icon.
3)In the upper section, enter the "packing material" (PK-100)
4)In the lower section, change the "partial quantity" to 40 of material R-1160.
5)Select both the lines of upper section and lower section and click the green ok. It generates a shipping unit/handling unit number.
6)Now, select both lines of upper & lower section & click the button "per part. qty" (New HU per part qty of material)
Check: click "General Overview" icon to see whether it packed 40 pieces of material in 3 cartons.
B)Packing all 3 cartons in one big carton(PK-095)
1) from above screen, click "pack HUs" (pack shipping unit)
2)enter the packaging material (PK-095) in the upper section and select this line.
3)select 3 lines of PK-100 in lower section since you want to pack them in PK-095.
4)selecting both lines, click "pack" icon.
5)Now all the 3 cartons(PK-100 with 40 pieces each of material) are packed in one big carton (PK-095).
Check: "General overview" icon.
Then "save" the delivery.
HANDLING UNITS.
Basically handling units come into picture when you want to carry out multi level packing. suppose you want to pack Nokia phone first into a polythene bag, then this polythene bag is again packed in to box. like that. then this box will become a handling unit. For this go to :
IMG - Logistics General - Handling Unit Mangement - Basics.
1. In basics you do the same thing as you did in the packing in logistics execution. like you create the packaging material type, then MGPm and their assignment.
2. Then go to External Identification - and maintain the number ranges forthe handling units that you want and assign the same to your pckaging material type.
3. Now that you have done everything, create the order, save it, in VL01N, enter shipping point, go to edit - pack - do the same thing as i ahve told you in the step no. 6 (above). now after doing select the PACK HUs TAB . NOW IN THIS SCREEN IN THE TOP PART YOU WILL SEE THE ALREADY PACKED MATERIAL. In that same part again select your next packaging material that is BOX. enter the system will assign the number to the BOX.
4. Now select the material which you have just entered and the materials which were already packed in the lower part of the screen and click on the ICON PACK.
This is what I know about the packing process and the handling unit. you have many things in the handling unit management whichcan be very useful for automatic packing.
Reward points if u helpful
Cheers,
Govind.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
97 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.