cancel
Showing results for 
Search instead for 
Did you mean: 

item categoires

madhan_narlapuram
Contributor
0 Kudos

hi,

i have a material (kmat type) and i mainited bom items for it which are also kmat type.

how can i explode the bom items for a kmat type in the sales order ?

what are the item categories need to be taken care of to explode kmat type materials?

thanks

mmn

rewarsds for sure

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

Based on the how BOM is set up and item category assigned to the head material and components you could use different combinations as described below.

The following item category groups determine which item categories are assigned to configurable materials in the sales order:

Item category group 0002

Pricing and transfer of requirements for header material

Item category group 0004

Pricing and transfer of requirements for components

The BOM of the configurable material may contain configurable assemblies, which are copied to the sales order as subordinate items. The item category group of the materials and the item category of the superior material determine the item category of these subordinate items.

Determining Item Categories

Superior configurable material

Non-configurable assembly

Configurable assembly

Item category group

0002

NORM

0002

Item category

TAC

TAE

TAE

Superior configurable material

Non-configurable assembly

Configurable assembly

Item category

TAE

TAE

TAE

Superior configurable material

Non-configurable assembly

Configurable assembly

Item category group

0002

NORM

0004

Item category

TAC

TAE

TAE

Superior configurable material

Non-configurable assembly

Configurable assembly

Item category group

0004

NORM

0002

Item category

TAM

TAN

TAC

Superior configurable material

Non-configurable assembly

Configurable assembly

Item category group

0004

NORM

0004

Item category

TAM

TAN

TAM

<b>Reward if this is helpful.</b>