Dear All,

1) In Quality Server i have 40 GB free space.

2) i have done Client Export from Production Server. PRD Data is 70GB.

i want to bring the production Data to Quality

Production Data size is : 70GB

Quality Server FreeSpace is : 40GB

1) if i create a new client 600 in QAS and i Import it How much space will it occupy

Can i overwrite the Existing 400 Client available in Quality by importing the production export Request so that it will override the Existing 400 client Data.

or

Guide the step by step process of Cleint Refres in Oracle ECC5

Which is the Best Option Import the Request or Client Refresh

Regards

SNB

Accepted Solutions (0)

Answers (6)

Answers (6)

Former Member
0 Kudos

Thanks for dowloading the information. please provide me the Steps for the the whole Database copy(System refresh)?

Regards

SNB.

Former Member
0 Kudos

Hello Shankar,

Kindly go through

http://service.sap.com/systemcopy in that you click the link of Media Library.

You will get information on Homogeneous or hetrogeneous System copy methods.

Regards,

Vivek

Former Member
0 Kudos

Hi shankar Narayana

Do u mean Client export/Import or the whole Database copy(System refresh)?

In the case of Export/Import its quite simple.

Just goto scc8 T-code and export the data which you require with the profiles like SAP_ALL, SAP_CUST etc.,

Export the files which you get in /usr/sap/trans/data; /usr/sap/trans/co-files to the target system.

In target just import the data using scc7 T-code.

Select the data you want to import using the same profiles again.

If you require system copy procedure please let me know.

Regards,

Phani kumar G.

Former Member
0 Kudos

Dear All,

Can anyone please provide the System Refresh steps.

Regards

SNB.

Former Member
0 Kudos

Hi,

The remote client copy is time consuming and will be depend on the network connection. It is not suggest to do the remote client copy for a large database.

You can go ahead with client export and import process to refresh the client.

But before starting client copy, turn off the archiving and proceed.

Br

Vanga Reddy

Former Member
0 Kudos

hi,

Do a Client Export/Import. That would be much faster compared to Remote Client Copy.

" Points for solutions".

Regards,

Sandeep.

Former Member
0 Kudos

Dear All,

Thanks for updating. Both the Systems have Same configuration

Please gudie me the Process for

System Refers

Remote Client Copy (SCC9)

Regards

SNB

Former Member
0 Kudos

Hi,

You can overwrite the existing client data in quality with the prd data.

For system refresh you need to have similar sapdata filesystems in quality as in production.

Thanks,

Sandy.