cancel
Showing results for 
Search instead for 
Did you mean: 

DOCUMENTATION ON MAKE TO ORDER AND MAKE TO STOCK

Former Member
0 Kudos

ANY SEND ME STEPS AND DOC ON MAKE TO ORDER AND MAKE TO STOCK

POINTS WILL BE REWARDED

send at seshu_1977@yahoo.com

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Sent the mail reward if helps

Former Member
0 Kudos

Can you please send me the same mail.Points will be rewarded if helpful.

Regards,

Partha

partha.das@patni.com

Answers (5)

Answers (5)

Former Member
0 Kudos

Hi,

https://www.sdn.sap.com/irj/sdn/wiki?path=/display/erplo/qm-sd

In Make to Order Production the characteristics required by the customer are specified in the configuration in the sales order. The limits that are used for inspection are based on the configuration. When goods are shipped, a certificate can be included to document that the goods comply with the customer specification.

In Make to Stock production the product is manufactured and inspected according to your own specifications. Batch determination during fulfilling sales order or delivery can be done according to customer specific requirements. When goods are shipped, a certificate can be included to document that the goods comply with the customer specification.

Make To Stock:

http://help.sap.com/saphelp_ides/helpdata/en/51/9532c0a1fa11d189ba0000e829fbbd/content.htm

/thread/469340 [original link is broken]

<b>Sales Order Management Make-to-order:</b>

http://www50.sap.com/businessmaps/092BF1DFEEB2456DADD0DD0284EBE8A2.htm

Regards,

Naveen.

Former Member
0 Kudos

Hi Seshagiri,

Can u send the config details of Make to Order & Make to stock to chandu710@gmail.com.

awaiting from u.

points would be given.

chan

Former Member
0 Kudos

Hi,

Make-to-order:

Make-to-order processing takes place when inventory is not generally stoked but instead the firm wants until an order hass been placed and then produces just what has been ordered.

Ex: In this case, a deluxe motorcycle gas tank that must be produced form an unpainted tank, paint and gas cap. These are two processes that must be completed in the production -


paint the tank and when tank is dry, attach the gas cap.

The BOM are needed to create a given product. The routing information gives what processes need to be carried out in what order and even how long each process should take. All this information together can be used to determine what the total cost of the product and determining the profitability of the product.

A—Creation of materials:---

T code: MM01

Ex; 1400-7—1xx

Enter material, ind. Sector and material type.

Select the org. levels plant, stor. Location, sales org, DC, Warehoused no, storage type.

Repeat the same process for all components.

B—Creation of BOM:--

T code: CS01

C—Set up routing:--

T code: CA02

D—pricing conditions:--

T code: VK11

E—purchasing materials:--

Create a purchasing order req. for components from vendor.

Create PO: ME21

F—Receiving materials:--

GR:- MIGO

Go through MMBE then u will get stock available or not.

Process:

1. creating a sales order for product not kept in the inventory. This will atomically generated the relevant production order.

2. we assume production is done ahead of \schedule. After production is completed you will confirm production order as fully completed .

3. Newly determine the availability of sales order.

4. shipment

5. TO for delivery

6. Billing

7. Payments

Reward points if u helpful.

Cheers

Govind.

Former Member
0 Kudos

MAKE TO ORDER

<a href="http://help.sap.com/saphelp_ides/helpdata/en/51/95368ea1fa11d189ba0000e829fbbd/content.htm">http://help.sap.com/saphelp_ides/helpdata/en/51/95368ea1fa11d189ba0000e829fbbd/content.htm</a>

<a href="http://help.sap.com/bestpractices/industry/indusmachinerycomp/v1470/IMC_DE/html/E71_MTOSalesOrdProc_EN_DE.htm">http://help.sap.com/bestpractices/industry/indusmachinerycomp/v1470/IMC_DE/html/E71_MTOSalesOrdProc_EN_DE.htm</a>

Make-to-Order (Customer Requirements)

<b>

Creating a Sales Order</b>

Checking Requirements Using MRP

Requirements Planning

Converting the Planned Order into a Production Order

Confirming the Production Order

Checking the Settlement of the Production Order

Creating a Delivery

Creating a Billing Document

Checking Costs and Revenues on the Sales Order

<b>

Make-To-Stock Production</b>

Planning a Product

Creating a Sales Order

Executing Multi-Level Requirements Planning

Converting the Planned Order into a Production Order

Withdrawing the Material for the Production Order

Confirming the Production Order

Creating a Delivery

Creating a Billing Document

<b>Engineer-to-Order with Planning of Production Lots (SEIBAN)</b>

Creating a Change Number

Creating the Material BOM

Creating a Production Lot

Creating a Planned Independent Requirement

Changing the Planned Independent Requirement

Creating a Cost Estimate for the Production Lot

Activating the Cost Estimate for the Production Lot

Executing MRP for the Production Lot

Creating a Sales Order

Releasing the Project Definition

Assigning the Production Lot to the Network Reservation

Processing Planned Orders and Production Orders

Assigning the Finished Product

Former Member
0 Kudos

hi,

Business procedures material based on MRP irrespective of the sales order ie Make to order

If the standard product is going to be change slightly according to the customer requirement then businss manufacturing that particular material for particular customer called as Make to order.

Inventory is going to be maintained in special stock indicator E order inhabd

Configuration

Create material master by maintaining general item category group- 0001(make to order)

Availability check - 02

Transportation Group - 0001

go to va01 and raise sales order

item category:TAk

Schedule line category : cp

Requirement type KE

Requirement class 040

Check TOR and avalability check

special stock : E

VOV7

of TAK

billing relivence : A

Pricing :X

go to mb1c

maintain stock with a special stock indicator E

mavement type 61

Special stock E

specify sales order number line item number and saveit

go to VL01N main data

Go to VF01

save it

note for make to order you cannot maintain availability check

sreekanth.vaka