on 07-06-2007 10:58 AM
while creating sales order, with refernce to contract system is giving a message
Configuration not possible for material : Reason 3 --> Help
Message no. V1360
and the message is as follwed can any one explain
Diagnosis
This may have been caused by one of the following:
1. The configuration profile for the material allows or requires the bill of materials to be exploded during order processing. However, a plant has not been specified in the item.
2. The configuration profile of the material allows or requires the bill of materials to be exploded during order processing, but the order quantity in the item must be greater than 0.
3. A configuration profile has not been maintained
or
A configuration is not permitted for the material
or
4. The configuration profile of the material allows or requires the bill ofmaterials to be exploded during order processing. However, the system could not determine a date because important data is missing from the item (see incompletion log).
Hi
I think you have both Variant configuration and BOM.
Pls ensure the following.
1. BOM masterdata is maintained for the variants
2. Variant configuration is configured correctly
-
Configuration profile is created for the material
-
Knowledge base object and run time version are available
3. Maintain materials as not relevant for delivery or dont give delivery quantity as 0
Once you are sure that these are in proper shape, you can start creating order. The problem wont come.
Reward points if it helps you.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.