on 07-05-2007 3:15 PM
I am trying to perform a multilevel controlling. After marking flag to transfer I am getting the following error:
"There is no internal order for project xxxxxxxx". The WBS element is also not created. I am using auto mode for multilevel controlling.
Waiting for your feedback.
Hi, Anantharam
How can you work on multilevel controlling? Which document are you refering to?
Thanks.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You can check in help.sap.com
Pre-requisities:
1) accounting integration should be checked for the project type
2) Make settings in the ERP system (the system in which you need to reflect the cProjects as PS project)
In case you are not able to do the settings, pl. let me know and I would send you some documents
Hi Anantharam,
I am working on a requirement to get Cost/Revenue Rates from ECC6.0 to cProjects , I know the standard configuration can replicate data from cProjects to ECC6.0 , I need to know do we have anything from the other way round,
can you please send me the document which you have for cProjects Accounting Integration
to email-id kumar.sap@gmail.com
Thanks
Praveen
solved on own
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
106 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.