Hi Champs

I would like to know list of tables for PLM and linking between them Ex we will have Table MARA for material master basic view and Table AENR for change master. now when I create change for material master and changing the MM with that change number, then at backend, there will be some linking between these two tables . I would like to know how these tables are linked along with list of tables

Waiting for reply

KAMAL

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

Go through this

<u>http://www.erpgenie.com/abap/tables_mm.htm</u>

Regards

Rehman

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

Check these tables.

mara,mast,stpo,makt, aenr,aeoi, mbew.