on 06-29-2007 11:42 AM
Hi All
1.Hi Any 1 plz send me 1 technical spec regarding SD Module.
2. Send me the sales order, spec if u hav.
Thanku.
Pavan reddy.
Hi
i want Functional spec Regarding SD module. can u hav send to My e-mail id pavan.pagidela@gmail.com
Thank u.
pavan reddy.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Technical Spec for a Project.
Section 1.
Document Control
Change Log
Modification No. Change Date Description By 1.0 05.02.2003 First Version <Author>
Section 2
Table Of Contents
Section 3
Overview of the requirement.
Section 4
Process Flow
Section 5 - Detail Changes to be carried out.
<ABAP Name> - <ABAP Title>
Overview
Change Request
Selection Screen/Parameters
Reference to Tables
Include/Submits ABAPs
High Level Processing Logic
Output Format
Test Procedure
Other Impact
-
Program Name:
Title:
Application:
Development Class:
Message Class:
Program Type:
Execution Mode:
Schedule Frequency:
Variant:
1.2 Program Functionality
1.3 Output Fields
Output Label
Related SAP table-field (if any)
Length
Output Characteristics
1.4 Proposed Solutions
1.5 Solution to be implemented
1.6 Reasons of selection/rejection
1.7 Pseudo-Code / Flow Logic of the selected solution
1.8 Selection Screen
1.9 Database Tables Used
Table Name
Table Description
How the table is used in the program
1.10 External Files Used
1.10.1 External File Layout <file name>
1.11 Components External to Program Used
1.12 Error Conditions
1.13 Key Technical Test Conditions
1.14 Sample Test Data
1.15 Assumptions
1.16 Comments
-
or u can check this format also
Plz check this.
1 Low Level Design
1.1 General Information
The system shall allow the manual as well as automatic creation of a pick order against a delivery. In the case of manual pick orders, the system shall require the user to specify a bin location. For automatic pick order generation, the system shall use the FIFO (First In First Out) method to select the bin number. The system shall allow for automatic pick quantity confirmation via customized RF scanner screen interface.
The system shall allow for automatic delivery update via customized RF scanner screen interface. The system shall update the delivery with picked serial numbers.
The system shall automatically perform a post goods issue (PGI) transaction after pick confirmation and delivery update.
The system shall allow the user to scan the pump serial numbers and perform pick confirmation before shipment to customer. After the confirmation system shall allow the user to perform the Post Goods Issue transaction.
1.2 Business Overview
The purpose of this custom RF transaction is to give the users a flexible tool that can be used to scan the serial numbers to confirm the pick and perform Post Goods Issue transaction for the pumps to ship to customer.
1.3 Development Description - Technical Details
1.3.1 Object Details
Object Name Transport Request# Development Class Message Class Description
1.3.2 Selection Screen Details
Screen 1
1.3.3 Program Logic:
1.3.4 Data Input Details
1.3.5 Database Tables Used
Table Name Description (only for the custom tables) Read (Y/N) Update (Y/N) Comments
1.3.6 External files used
N/A
1.4 Process Flow
N/A
1.4.1 Dependencies
1.4.2 Data Flow
N/A/
1.4.3 Security and Control Requirements
1.4.4 Trouble Shooting / Error Handling/Restart & Recovery
1.4.5 Batch Scheduling Requirements
1.4.6 Program Output
1.4.7 Other
N/A
1.5 References
1.5.1 Hospira HLD
N/A
1.5.2 Functional Contacts
1.5.3 Other Technical Contacts
Other Documents and Links (Attachments)
N/A
-
In technical Spec you need to mention all the important details. i m providing some of it...
Specification Title
Author
Creation date
Program Name
Program Description
Development Class
Message Class
Program Type
Functional Area/Sub Area
Transaction code
Development Client
Testing Client
Reference program
Remedy id
Reference Business Design Doc
Reference Functional Spec
SAP Correction #
Processing Type
Frequency
Trigger
Volume
Complexity
Priority/Expected On or Before
Business Overview
Technical Specification
Program Selection.
Program Logic(This is the most important part)
Output
-
GO THROUGH THESE LINKS
http://www.enigma.com/e/solutions/SAP_MRO_Technical_Doc_Integration.pdf
http://www.sap.com/services/consulting/servicecategories/qualityandriskmgt/technicalreview.epx
-
You have to ask for the tech specs format from your team lead.. its very easy once you get the format..just fill whatever is required
Refer this thread for more information
/message/2352778#2352778 [original link is broken]
some helpful links
http://www.enigma.com/e/solutions/SAP_MRO_Technical_Doc_Integration.pdf
http://www.sap.com/services/consulting/servicecategories/qualityandriskmgt/technicalreview.epx
/message/2339516#2339516 [original link is broken]
-
Rewards point if helpful....
regards...
Abhay.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
68 | |
26 | |
9 | |
9 | |
7 | |
6 | |
4 | |
4 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.