cancel
Showing results for 
Search instead for 
Did you mean: 

Regarding SD Spec

Former Member
0 Kudos

Hi All

1.Hi Any 1 plz send me 1 technical spec regarding SD Module.

2. Send me the sales order, spec if u hav.

Thanku.

Pavan reddy.

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi

i want Functional spec Regarding SD module. can u hav send to My e-mail id pavan.pagidela@gmail.com

Thank u.

pavan reddy.

Former Member
0 Kudos

Technical Spec for a Project.

Section 1.

Document Control

Change Log

Modification No. Change Date Description By 1.0 05.02.2003 First Version <Author>

Section 2

Table Of Contents

Section 3

Overview of the requirement.

Section 4

Process Flow

Section 5 - Detail Changes to be carried out.

<ABAP Name> - <ABAP Title>

Overview

Change Request

Selection Screen/Parameters

Reference to Tables

Include/Submits ABAPs

High Level Processing Logic

Output Format

Test Procedure

Other Impact

-


Program Name:

Title:

Application:

Development Class:

Message Class:

Program Type:

Execution Mode:

Schedule Frequency:

Variant:

1.2 Program Functionality

1.3 Output Fields

Output Label

Related SAP table-field (if any)

Length

Output Characteristics

1.4 Proposed Solutions

1.5 Solution to be implemented

1.6 Reasons of selection/rejection

1.7 Pseudo-Code / Flow Logic of the selected solution

1.8 Selection Screen

1.9 Database Tables Used

Table Name

Table Description

How the table is used in the program

1.10 External Files Used

1.10.1 External File Layout <file name>

1.11 Components External to Program Used

1.12 Error Conditions

1.13 Key Technical Test Conditions

1.14 Sample Test Data

1.15 Assumptions

1.16 Comments

-


or u can check this format also

Plz check this.

1 Low Level Design

1.1 General Information

The system shall allow the manual as well as automatic creation of a pick order against a delivery. In the case of manual pick orders, the system shall require the user to specify a bin location. For automatic pick order generation, the system shall use the FIFO (First In First Out) method to select the bin number. The system shall allow for automatic pick quantity confirmation via customized RF scanner screen interface.

The system shall allow for automatic delivery update via customized RF scanner screen interface. The system shall update the delivery with picked serial numbers.

The system shall automatically perform a post goods issue (PGI) transaction after pick confirmation and delivery update.

The system shall allow the user to scan the pump serial numbers and perform pick confirmation before shipment to customer. After the confirmation system shall allow the user to perform the Post Goods Issue transaction.

1.2 Business Overview

The purpose of this custom RF transaction is to give the users a flexible tool that can be used to scan the serial numbers to confirm the pick and perform Post Goods Issue transaction for the pumps to ship to customer.

1.3 Development Description - Technical Details

1.3.1 Object Details

Object Name Transport Request# Development Class Message Class Description

1.3.2 Selection Screen Details

Screen 1

1.3.3 Program Logic:

1.3.4 Data Input Details

1.3.5 Database Tables Used

Table Name Description (only for the custom tables) Read (Y/N) Update (Y/N) Comments

1.3.6 External files used

N/A

1.4 Process Flow

N/A

1.4.1 Dependencies

1.4.2 Data Flow

N/A/

1.4.3 Security and Control Requirements

1.4.4 Trouble Shooting / Error Handling/Restart & Recovery

1.4.5 Batch Scheduling Requirements

1.4.6 Program Output

1.4.7 Other

N/A

1.5 References

1.5.1 Hospira HLD

N/A

1.5.2 Functional Contacts

1.5.3 Other Technical Contacts

Other Documents and Links (Attachments)

N/A

-


In technical Spec you need to mention all the important details. i m providing some of it...

Specification Title

Author

Creation date

Program Name

Program Description

Development Class

Message Class

Program Type

Functional Area/Sub Area

Transaction code

Development Client

Testing Client

Reference program

Remedy id

Reference Business Design Doc

Reference Functional Spec

SAP Correction #

Processing Type

Frequency

Trigger

Volume

Complexity

Priority/Expected On or Before

Business Overview

Technical Specification

Program Selection.

Program Logic(This is the most important part)

Output

-


GO THROUGH THESE LINKS

http://www.enigma.com/e/solutions/SAP_MRO_Technical_Doc_Integration.pdf

http://www.sap.com/services/consulting/servicecategories/qualityandriskmgt/technicalreview.epx

-


You have to ask for the tech specs format from your team lead.. its very easy once you get the format..just fill whatever is required

Refer this thread for more information

/message/2352778#2352778 [original link is broken]

some helpful links

http://www.enigma.com/e/solutions/SAP_MRO_Technical_Doc_Integration.pdf

http://www.sap.com/services/consulting/servicecategories/qualityandriskmgt/technicalreview.epx

/message/2339516#2339516 [original link is broken]

-


Rewards point if helpful....

regards...

Abhay.

Former Member
0 Kudos

Refer

How to write a technical spec

Technical Spec for Interfaces...

/message/1865271#1865271 [original link is broken]