SNP Planned Orders Availability Date/Time

hitaloc1971
Participant
0 Kudos

Hi gurus,

Are there any way to change the availability time of an SNPPlanned Order to the begining of the bucket?. for example, the SNP Planned Orders resulting from the optimization have the following Avail date/time 29.06.2007 23:59:59 and I need them to have 29.06.2007 00:00:00.

Thanks in advanced

-Italo

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Hugo

In your Optimizer Profile you have two settings on the Model Params tab for bucket offset. These are factors used by the SNP optimizer to calculate the availability date of a receipt element within a period. There is one for produced item availability and another for shipped item availability.

As long as you have daily buckets then you can set these accordingly.

The Optimizer will not use the period factors elsewhere (for example on the transport lane).

Regards

Ian

digambar_narkhede
Contributor
0 Kudos

Hi,

Also see SAP Note 434197 - The Bucket Offset for more clarification.