on 06-21-2007 11:48 AM
Hi all.
can u tell me in Mtrl deter. technique, that i can assign one or more table in one access sequence.and i can assign different access sequence to different codition table.so what is differances in above case. because outcome is same in both cases, in which scenerio this cases is used.
Ex. Acces seq Z001 to condition table 001,002, and 900
and access seq Z001 to condition table 001
access seq Z002 to condition table 002
access seq Z003 to condition table 003.
thank u
If you have one access seq with 3 condition tables attached to it, then we can assign this access sequence to one condition type and all the condition records can maintained with reference to one condition type. This condition type can be assigned in the pricing procedure and listed only once.
If you have 3 access sequence then u need 3 condition types as one condition type can contain only one access sequence. 3 condition types will have to be listed in the prcing procedure.
Hope it answer ur question.
Regards
AK
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Ravaji.,
Generally in material determination we use 001 table that is material entered and for that we use the acess sequence A001,So our requirement can be solved wth one condition type A001,So can you please elaborate your requirement
REWARD if helpfull
Thanks & Regards
Narayana
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.