cancel
Showing results for 
Search instead for 
Did you mean: 

structure explosion not possible for the item

Former Member
0 Kudos

What is meant by structure explosion and not possible for item level.

Could anyone explian me the above mentioned.

prashant

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

structure scope determains weather it is poosible to configure the material in the sales document.

Former Member
0 Kudos

PLS CHECK ITEM CATEGORY SETTINGS VOV7

Structure Explosion For Item No Is Not Possible error because in item category field structure scope you have to maintain Aor B .It is not normal

Former Member
0 Kudos

Hi ,

It is structure scope. Structure scope will be used when u r doing BOM. There You can specify the extent to which non-configurable materials should be exploded in the sales order, that is, the level up to which subitems should be created for the bill of material components.

At the strructure explosion, u will have the controls like Donot explode material structure, Explode single level bill of material, explode multi level bill of material.

So structure scope determines the Whether BOM(bill of material) should be exploded or not.

Reward points if it helpful,

Regards,

Sree