Hi

without maintaining MRP Screens in material master can we perform availabilty check for a material.

reddy

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

I think yes.We need the field checking groupfor ATP check and that is maintained in sales general plant data.

In my earlier replay i gave it wrongly as No.

Regards,

Amrish Purohit

Answers (3)

Answers (3)

Former Member
0 Kudos

Yes. It can be maintained in Sales: General / Plant data in material master. It also depends on the Material Type you are using.

Regards,

Rajesh Banka

Reward points if useful.

Former Member
0 Kudos

Hi,

I think Yes it is possible. <b>We will maintain the Checking group for availability check in the Sales general plant at Avaialbility check.</b>

Based on the MRP group or MRP Type, Requirement type is detrmined in the sales document. <b>If we dont maintain these in the MRP Screens, Requirement Type is found out based on the material Type</b>. Based on the requirement type, Requirement class is determined where there are controls for Avaialbility check and Transfer of Requirements.

If any doubt please let me know

Regards,

Sree

null

Former Member
0 Kudos

No ashwanth,

We can not do availability check with out MRP 3 screens.. you have availability check option is there..

reward if it hleps

Ramki