on 06-01-2007 6:29 AM
Dear All,
I have created dynamic modification rule for skip lot ( T05 for every 5 lots), And set the dynamic modification at the lot level.
1. Created dynamic modification rule, with skip for Every 5 lots.
2. DMR is set at the lot level.
3. DMR is created for lot creation level not for UD
4. While creating a GR, lot created automatically, here my problem is all the 5 lot are open for result recording, I am getting the lot status as "REL CALC SPRQ QLCH" and it is not changing to skip even if i give ud for the lots.
5. Inspection stage change happens correctly after 5 lots to normal inspection in the quality level.
Kindly guide me to solve this problem.
S.Thanigai
ok
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
You need to assign this DM rule to the inspection plan and material combination.
In the inspection plan header u need to assign the rule and the dmr type.
Then it will work .
For first lot RR will be open and for the next 5 lots only UD will be open.
For that too you can go for automatic UD.
Hope this helps.
Regards
Ananth Raj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi selvam,
when you have activated DMR for the material, lot will be generated for skip lot as well, but the quantity wil not be under quality inspection.
Have u checked whether the quantity is there under quality or in un-restricted use?
Cheers
Alfred
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.