cancel
Showing results for 
Search instead for 
Did you mean: 

Costing run problems

Former Member
0 Kudos

while running costing run, system is showing following error messages.

1. Msg No. 240 Cost component split costed with value of zero

2. Msg No. 168 Cost estimate for material PC-ROH3 / plant is incorrect

Pl. guide

Ranjeetsinh

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member184627
Active Contributor
0 Kudos

Hi,

Pl. check if the price field is updated in the matl master for the raw material.

Also check if the indicator cosing with quantity structure is check i nthe costing tab of the HALB for FERT.

Then use ck11n to run. In this T.code check the dates, lot size, bom,routing.

Regards,

SDS

Former Member
0 Kudos

Please check the costing run in CK11n for the material which you got this error message. There may be the case that the inputs value may be greater than the Output value and there may be a negative value in the output.

Or else there is no routing/ recipe for the material.

Please check and run it again.

Please go thru the logs which might give you a clear idea on the error.

Hope this helps you.