on 05-29-2007 1:38 PM
Hello,
we have a requirement to extend the normal substitution logic.
Assume substitution (Material determination) is setup to ship product A, when nothing is available anymore ship product B.
Normally when ordered is 10 CS of Product A and Material Determination cannot find A, it ships 10 CS of B. So far so good.
Our requirement is that if the 1 CS of product A contains 10 IT, and 1 CS of product B contains 20 ITs to have a logic that only ships as much items as ordered.
So if customer orders 10 CS of A (100 ITs) and there is no stock of material A left we ship 5 CS (100IT) of B.
Furthermore this should happen during delivery creation (availability check). Are there any user exits that may be used for implementing that logic?
Thanks for any suggestions.
This message was moderated.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.