on 05-25-2007 1:36 PM
please let me know the the below answer?
is Order Date Promised where can we find?
is some thing equal to availability date or conformed date or is it different?
pl let me know the sameIf it is different .
Thanks&reagrds
Sumanth.E
Hello Arun,
The system determines the availability of materials according to the ATP method (availability-to-promise). Using this method, the system checks
Whether the material requirements can be covered on the requirements date
At what point in time the requirements can be covered, if a full coverage of the requirements is not possible on the requirements date.
the date promised...~ ATP
If an overall check determines that a material is not available on the required date, the system activates the status "material shortfall" in the order header.
The status "material shortfall" is withdrawn during an overall or individual check if the required quantity of all components becomes available in the mean time according to ATP (available-to-promise) logic.
Reward if this helps
regards
AK
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.