on 05-21-2007 11:13 PM
Hello all,
Here is the background:
Created a Sales Order with Material determination(Auto Product selection). Initially the stock was level for the main material was 3 and the order was created for 4.
System confirmed the 3 nos and delivery / PGI were executed.
After this, stock of 1 No was added and then V_RA was run to execute the back order. The system acknowledged the back order and also the receipt of the material, but it is NOT permitting the back order transaction to be carried out. The whole screen is in display mode .
Can someone help? Any thoughts please?
Note - There are no lead times in the Material Master. All associated calendars - Customer Unloading point, Shipping point, Sales Org set to 365 days working.
Materials created a fresh for this experiment so not reserved against any old orders.
Hi Kindly u do this go to the SO and double click n line item,Check the tab schedule lines there go to environment tab and check aval.check,
Inside avail.check click on total records at the top right side,
Check for which SO number stock got confirmed ,go to that give reason for rejectio and comebak to Your current SO,go to line item check the edit tab , check the item availability ,qty will get confirmed.
Rewards if it's helpfull
Shyam
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
While thanking you the responses I think you have not really understood tha actual problem.
I repeat:
Created stock on 1 no. of Material M1 using TCODE MB1C
Then created Sales Order for 2 nos of Material M1 using TCODE VA01. System confirms 1No. in Av Check
Again add stock on 1 more no. of M1 using TCODE MB1C
Now do back order processing for the Material M1. Technically, now that stocks are available, the system should carry out the BO process and we should be able to alloacte the stock item to the Sales Order.
The Sales Order DOES show up on the list, but the system does not allow us to double click in the order and carry out a BO processing. However was able to carry out BO processing the next day !!! Why???? (Please see note below)
Note: The Material M1 has been created without any processing/ manufacturing lead times whatsoever. So the moment the material is placed in stock it must be available for processing.
In the Material determination condition record what is the Proposed reason that has been maintained. I think if the reason is 4, the system would try to proposed the new materail for the unfulfilled stocks.
Pls let me know if this is the case.
Mani
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.