Hi Guys,

During planning a production qty., system is picking up a PPM which does not exist in the system.

Does anybody know how this can happen?

Thanks

Kumar

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi P Kumar,

How do you know for sure whether it is picking a PPM

It can also be a PDS.

Why dont you check whether there is any PDS for the PRoduct Location.

Regards

Kumar P Ayyagari

Former Member
0 Kudos

That's a great analysis.

Yes, it was having a PDS which was creating the problem. I deleted the PDS and now it is picking the PPM of the material.

When I went to delete the PDS I found it was a Demand Planning PDS. In fact that material was a sub-component of another header material which had some demand.

CAN YOU PLS. REPLY ME ASAP HOW DO THIS DEMAND PLANNING PDS GOT GENERATED AND HOW I CAN PRVENT GENERATING DEMAND PLANNING PDS IN APO.

Thanks a lot.

Regards

Kumar

Former Member
0 Kudos

Hi P KUMAR,

Check this link

http://help.sap.com/saphelp_scm41/helpdata/en/8f/9d6937089c2556e10000009b38f889/frameset.htm

http://help.sap.com/saphelp_scm41/helpdata/en/62/944d40cef71059e10000000a155106/frameset.htm

There are two methods of generating a PDS:

(1)From an iPPE

(2)From a production version or a bill of material that you created in R/3 and transferred using the CIF interface.

This means you can use bills of material from SAP R/3 in the DP-BOM function.

It is not possible to create a PDS directly.

Hope this helps.

Regards

Kumar Ayyagari

Former Member
0 Kudos

Thanks

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi P KUMAR,

I think HARISH has already mentioned this to you.

Kindly close all your threads for which you have got answers and If you think someone has solved it, reward them with points

Regards

Kumar Ayyagari