Urgent: Need help in automatic credit control

Former Member
0 Kudos

Hi SD Seniors

Please help me in the URGENT Credit check Control Configuration.

According to the user requirement, need to have simple static credit control in the place of sales order & delivery.

When credit check fails during the order creation,

1. Wants to popup the warning message without blocking the delivery

2. And wants to block the delivery from the PGI process.

I have already done the necessary credit check configuration in my test system. Based on the simple credit limit check,

System issues the warning message correctly at the time of order creation.

And I have configured the automatic credit check control configuration for the blocking the delivery PGI steps. But system doesn’t block

The delivery and it still allow proceeding for PGI without any error message.

Please refer by below automatic credit control check for blocking the delivery. Please let me know, is there any other step I missed out here.

1. Credit control area is assigned to the company code.

2. Credit control area is assigned to the sales area.

3. Credit control area is assigned to the payer.

5. OBZK: Assigned

7. Risk category for each credit control area.

8. OVA8: -Credit control area + Risk category + Credit group

9. FD32: -Credit limit, Risk category, Currency: assigned

10. OVA7/VOV7: - Activated correctly

11. V/08: - Pricing Procedure subtotal set to A

12. OB45: - Update Group 00012

Your help is very much appreciated.

Thanks in advance

Regards

Priyan

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

But did u assign the GI credit group to your delivery type in OVAD.

Then based on this credit grp,maintain ur settings in OVA8.

Regards

Karan

Former Member
0 Kudos

Karan, Thanks For you Quick Response.

OVO8: Cr.Ctrl.Area + Rick.Catg + Credit.Group (03)

The same credit group was assigned to the OVAD also.

OVAD: Dely.credit.grp = 03 (Credit group for goods issue)

AND

GI.Credit.group = 03 (Credit group for goods issue)

Is it correct?

My doubt is where exactly, we are telling the system to block the delivery.

In OV08, could you please tell me what are all the settings need to be done for