on 05-16-2007 8:39 PM
hi All:
I created Int.model for PDS's activated successfully, Since I couldnt see the PDS in APO, First did a intial tranfer using program RIMODINI I got this message:
<b>Function: /SAPAPO/CUSLNTRTO_CREATE_RTO
Text: No single or multiresource can be used</b>
Again tried using transaction CURTO_CREATE which gave successful message for transfer of all PDS but only one ERROR listed below
<b>Error in APO: /SAPAPO/CURTO 817 No single or multiresource can be used in SNP PDS
Message no. CURTO1010
Diagnosis
The error described in the message with number 817 from message class /SAPAPO/CURTO occurred in SAP APO during the generation of the production data structure.
Procedure
You can find the associated message text in SAP APO in message 817 of message class /SAPAPO/CURTO.</b>
Also all my PDS's are SNP with rough cut plng. Please advice how do I proceed to rectify the above error.
Thank you
Sadat
Sadat,
Looks like a problem with RESOURCE MASTER DATA.
Check whether all the resources are created properly and assigned to the active version.
Then reactivate the PDS integration model and check
REgards
KUmar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Activate CFC9 transaction in R3 and in the workcenter , click on APO resource button, there u can select the resource type as single mix or multi mix resources for SNP
Hope this helps
regards
Vijay
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sadat,
Check the below note to fix this issue.
1194445 - Short dump contains single_exit_multiply_active error - SAP GDQC
Thank you,
Lingaiah
HI Sadat.
For SNP PDS the resources need to be either Single Mixed or Multi Mixed type resources. This is controlled through the CIF in:
SPRO: Integration with other SAP Components->APO->Application Specific Settings->Settings for resources
Set the fields for resource types to 4 & 5 (or whatever is suitable to your case).
You will need to send across new work centres.
This will allow SNP PDS.
Hope this helps.
M
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi there,
I did configure in CFC9
Type Single Resource - 4
Type Multiresource - 5
Deleted the existing resources in APO, resent the new work centres across but it happen to be they are again either single or multi resource rather than singlemixed or multimixed required for SNP PDS.
Do I need any config on APO side too. As the error msg Diagnosis points out APO below.
<b>Diagnosis
The error described in the message with number 817 from message class /SAPAPO/CURTO occurred in SAP APO during the generation of the production data structure.
Procedure
You can find the associated message text in SAP APO in message 817 of message class /SAPAPO/CURTO.</b>
Please help
Sadat
Sadat,
Delete the resources again and maintain the following setting in R3 work center,
" CAN BE USED BY SEVERAL OPERATIONS "
Refer to how you can go to this field by looking at the thread
************************
Resend the PDS integration model from R3 again
Hope this helps..
Regards
Kumar Ayyagari
Message was edited by:
Kumar Ayyagari
User | Count |
---|---|
7 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.