cancel
Showing results for 
Search instead for 
Did you mean: 

Standard Analyses

Former Member
0 Kudos

Hi all

could anyone help me with this.

I have created an information structure (consistent Planning) and a planning type(for 52 weeks). a planning hierarchy is also created with Co.code-plant-customer group - product hierarchy - material.

in flexible planning for the planning type, i enter the planning values for all the materials in a few versions.

now when i want to compare version to version which can happen in standard analyses MCSI - it says no data exists for selection.

r there any special parameters to be maintained or any settings?

Please help. very urgent.

points assured

Chandra

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Statistic Group:

Purpose – To capture data for Standard Reports, we require to activate Statistic Group as under:

--> Item category (Configuration)

--> Sales document type (Configuration)

--> Customer (Maintain in Master data)

--> Material (Maintain in Master data)

When you generate statistics in the logistics information system, the system uses the combination of specified statistics groups to determine the appropriate update sequence. The update sequence in turn determines for exactly which fields the statistics are generated.

Configuration:

IMG --> Logistics Information System (LIS) --> Logistics Data Warehouse --> Updating --> Updating Control --> Settings: Sales --> Statistics Groups -->

1. Maintain Statistics Groups for Customers

2. Maintain Statistics Groups for Material

3. Maintain Statistics Groups for Sales Documents

4. Assign Statistics Groups for Each Sales Document Type

5. Assign Statistics Groups for each Sales Document Item Type .....

Regards,

Rajesh Banka