Former Member
0 Kudos

Hello,

I created a production order with external processing, but when I did the cost analysis the system display the follow:

The service was created without origin and I need to display the service description in the analysis. I used the following control key:

and was assigned to an operation in my routing:

The information for the external work is the following:

I don't know what is the problem. I want you to help me on that. I don't know if I am missing a step or if there is something wrong.

Regards.

Accepted Solutions (0)

Answers (2)

Answers (2)

0 Kudos

Hello,

Change the control key to TX03 in CA02 for that particular operation and try once 

Regards,

Naveen Katari

former_member198692
Active Contributor
0 Kudos

Hi,

Check whether Material origin is ticked in material master(MM03) for your external process material.

Regards

Prasad