No confirmation by the requested date gATP

Former Member
0 Kudos

Please help me here I followed steps

  1. Created new material
  2. Assigned Strategy group 20 in MRP 4 view
  3. CIFed Material, ATP, PIR, Sales order, Stock at location etc
  4. Checked in live cache RRP3 Product view
  5. Received some inventory
  6. created sales order
  7. the problem when it is checking ATP it is taking to gATP  but doesn't confirming the schedule line
  8. What we need to do

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi

Hope you've the basic/core configurations of RBA GATP configured correctly.

Check whether the Rule configure correctly ( Product Substitution /Location substitution / Loc Determination Procedure) in /sapapo/rba04

Check the RULE CONTROL whether the location search is activated ( Top to Bottom / Bottom to Top etc)

Check whether the condition record exists for all locations-Sold to Party etc.

Check the Product Master whether the CHECK MODE & ATP Group updated correctly at all location for the product.

Check whether Active Integration Model exist.

Simulate your confirmation using /n/sapapo/ac04 - ATP simulation check

Check these and let us know your findings

Just my thoughts

Regards

Vinoth

Former Member
0 Kudos

Why we need the basic core configuration,

I sent ATP check through CIF

Question is Schedule lines are not getting confirm.