Hi ,

I am planning to connect non-prods systems with dev solution manager and production system to another solution manager.

so the two will be having a different LMDB and Central SLD systems..even wily server separate one...the idea is reduce the load of prd-solution manager.

please give your suggestions for this scenario and let me know possible challenges..

Thanks in advance

Accepted Solutions (0)

Answers (1)

Answers (1)

0 Kudos

Hello Daniel,

Maybe you already thought about it but you could use SLD bridge to update both of your SLD and have same datas on your dev and prod Solman regarding your satellites systems.

Configuring the SLD Bridge - System Landscape Directory - SAP Library

Regards

former_member201054
Contributor
0 Kudos

Would it be possible to convert the existing central SLD into SLD bridge without affected connected systems.

Please clarify and suggested with possible options..

Thanks in advance

0 Kudos

SLD bridge make possible the sync between two SLD, it is not going to convert anything and it does not affect the connected system, don't worry.

Please take a look at this => SLD Content Synchronization - Configuring, Working with and Administering System Landscape Dir - SAP...