Calendar settings for newly created plant

0 Kudos

Hello All,

One new plant has been created in ECC and CIFed to APO so same plant is available in APO. When I checked calendar tab in APO ( /n/SAPAPO/LOC3) and it’s not updated. So would like to understand the process for calendar settings in APO and same factory calendar is assigned to some other plant.

Do we need send through Transfer Global Settings ? or something else.

Thanks,

Srikanth

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Srikanth,

In APO, assignment of Calendars to Locations are considered to be master data, not configuration. If you wish to use one of the calendars in the Location master, you have to create the timestream yourself (/SAPAPO/CALENDAR) and assign it to the Location (/SAPAPO/LOC3).  There is no CIF or transfer job that will perform these tasks.

Best Regards,

DB49