SAP for Utilities Discussions
Connect with fellow SAP users to share best practices, troubleshoot challenges, and collaborate on building a sustainable energy future. Join the discussion.
cancel
Showing results for 
Search instead for 
Did you mean: 

ISU-RTP : Multiple Interval permissible rates execution sequence

Former Member
0 Kudos

Hi..

Need help.

As per requirement we have configured multiple Interval permissible rates in billing schema, but however I don't want to execute both rates one after another.

I want to use o/p of  interval permissible rate 1 & want to do some calculation in normal facts permissible rates in billing schema.

Then I want to use same o/p in another interval permissible rate 2.

In Billing schema rate sequence is as

1. Interval permissible rate 1

2. Facts permissible rate

3. Interval permissible rate 2.

While billing in runtime it is observed rates execution is as

1.Interval permissible rate 1

2.Interval permissible rate

3. Facts permissible rate.

Whatever sequence defined in billing schema interval permissible rates are getting executed first followed by other rates in schema.

Pls share experience as anyone tried with multiple Interval permissible rates in schema ?

Thanks in advance.

4 REPLIES 4

former_member230926
Active Participant
0 Kudos

Hi Deepali,

This kind of behavior I have seen for DPC enabled schemas, are your schemas are DPC enabled ?

regards

Manoj

0 Kudos

Hi Manoj,

No billing schemas are not DPC enabled ..

Thanks

Deepali.

0 Kudos

Hi Deepali,

Ok in that case I don't have the exact answer for your query. but one suggestion

Can't we write Rate 2 (Fact per) logic at the end of Rate 1 and restrict extra logic with some Flag operand" .

Regards

Manoj

0 Kudos

Hello Manoj,

Yes thts the only option to configure entire logic in one Interval permissible rate.

Will update on progress soon.

Thanks .