Error in work flow of bpm

Former Member
0 Kudos

Hi Experts,

In production one work flow got failed,  because of mapping error, since one of the idoc has the wrong data. BPM is doing collection of Idocs, it collected 6 Idocs, in which 3 idocs has wrong data, so its failed in mapping.  Is it possible to restart the work flow by leaving the error idocs in PI?

Please suggest for further steps to resend the IDOCs.

Thanks,

Chandar

Accepted Solutions (1)

Accepted Solutions (1)

former_member186851
Active Contributor
0 Kudos

Hello Chandar,

I dont think this is possible.

You can get the idoc number and restart from ECC leaving the error Idocs.

Former Member
0 Kudos

Hi Raghuraman,

thanks for the reply, but I have 65 idocs in another failed work flow, in which one idoc has bad data,, so do i need to retrigger 64 idocs again?

Thanks,

Chandar

former_member186851
Active Contributor
0 Kudos

Hello Chandar,

There should be some program for mass processing,you can check with the ABAPer.

Answers (1)

Answers (1)

apu_das2
Active Contributor
0 Kudos

Hi Chandar,

As Raghu said this is not possible. By the way which version of PI are you using. Using IDOC_AAE adapter idoc collection can be done without using BPM.

Thanks,

Apu

Former Member
0 Kudos

HI

Thanks for the response, the bpm is already developed and its running in the production,

the version we are using sap pi7.11

Thanks,

Chandar

former_member186851
Active Contributor
0 Kudos

Chandar the only way is what I mentioned.