on 08-02-2016 1:06 PM
Hello,
We try to setup following time profile in IBP6.2 with levels
Level | Base Level | Period type |
---|---|---|
1 Day | Day | |
2 Technical Week | 1 | Technical Week |
3 Week | 2 | Week |
4 Period | 3 | |
5 Month | 2 | Month |
6 Fiscal Year | 4 | |
7 Year | 5 | Year |
During activation we get error on some keyfigures e.g. In calculation 101222676 | HKFPER@PER, ensure that the output key figure planning level is a subset of the input key figure(s) planning level (custom attribute assigned to technical week for weighting period factor)
When i check the calculations of the keyfigure in there is used PERIODID4
"PERIODID4" |
Based upon the config guide reference to PERIODID would be following?
PERIODID0 - Day
PERIODID1 - Year
PERIODID2 - Fiscal Year
PERIODID3 - Month
PERIODID4 - Period
PERIODID5 - Week
PERIODID6 - Technical Week
However in attributes only PERIODID0-PERIODID4 exist and probably now link to week level cannot be made in the calculation?
If i would use day, technical week, week, Month, Quarter, Year i also need a PERIOD5 which also does not exist.
Does anyone know if i miss something or should the attributes PERIODID5 and PERIODID6 have been created by the system?
kind regards,
Harmen
I solved the problem, not all planning levels we're saved correctly after modifications.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
7 | |
4 | |
3 | |
2 | |
2 | |
1 | |
1 | |
1 | |
1 | |
1 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.