Report required for PM work order, Inspection lot and UD

former_member473962
Active Participant
0 Kudos

Hello Experts,

In my project, we are doing calibration/Inspection work orders for PM  equipments, such that on releasing the PM order an Inspection lot # gets generated against which we do result recording and note the UD for the same.

Is there an standard report in SAP QM, where all the following three fields can be seen together:

  • PM order #
  • Inspection Lot #
  • UD maintained for the Inspection lot.

Accepted Solutions (1)

Accepted Solutions (1)

former_member198406
Contributor
0 Kudos

Hi,

The transaction QA33 is the standard report available where you can have information for

PM Order

Inspection lot

UD for the inspection lot

Just, change the layout of the report as per your need.

Regards,

Dipeshkumar Bhavsar