Inspection lot is not being created automatically when I releaseed a production order, even I have maintained 03 inspection type in material master, maintained BOM, routing for the matrial.
Please send me the solution.
Thanks in Advance.
Regards
Suresh Kumar
Hello Suresh,
Please refer this the below thread.
Inspection lot not created at order release-MM0... | SCN
Please let us know if this helped?
Thanks and Regards,
Chitrakshi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
In the material master maintain the QM view
Maintain your Usage Decision codes using QS41 and QS51
Create your master inspection characteristics using QS21 (if results are being recorded)
Create a sampling procedure using QDV1 (if results are being recorded)
Maintain the routing using CA01
Create production order and select the assignment tab. The inspection lot field should be 0. Release the order and save then the inspection lot should be created and displayed in this field.
Hope this helps.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Suresh,
Please can you check if the 'Active' indicator [QMAT-AKTIV] checkbox is selected for the inspection type in your material master, plant combination.
Thanks,
Arijit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.