cancel
Showing results for 
Search instead for 
Did you mean: 

GBT - Batch master integration

Former Member
0 Kudos

Hi All,

We are in the process of integration of batch master creation in GBT system.

In ERP system, we have used batch level at material.So Batch number are created based on material level.

  • We have integrated the class type (023) with Class type 223 in GBT system.As per the set up class type 023 is used as material level.

But when I trying to send BATMAS IDOC to GBT system, we are getting the error as

"Plant number is given, but the batch numbers are not plant-specific".

Please guide us the procedure to overcome this error.

Thanks

KB

Accepted Solutions (1)

Accepted Solutions (1)

christoph_huber
Advisor
Advisor
0 Kudos

Hi KB,

could you please check if you already registered the system and the corresponding RFC connections in transaction /GBT/LOGSYS_CONFIG (Configuring of connected logical systems) in SAP GBT?

Regards, Christoph

Former Member
0 Kudos

Hi Christoph,

I have made config in /GBT/LOGSYS_CONFIG . In this step Batch level at plant is not set due to Batch level settings maintained as material level in ERP system.

Thanks

KB

lilly_yuan
Discoverer
0 Kudos

Hi, K B,

Please use Report: /GBTINT/R_SEND_BATMAS to send BATMAS IDoc from ERP.

If your batch level setting is on material level in ERP, your batch IDocs shall also be sent on material level. Analyzing from the error messgae, your batch IDocs are generated on plant-level. Why does it happen? You need to check whether it is the right client? Did you send IDocs by the correct report? Using the above named report, the error shall be avoided.

Best regards,

Lilly

Answers (1)

Answers (1)

Former Member
0 Kudos

This caused due to config.Thanks for guidance