Hello Chris,
Check this SAP note: 1706137 - Receive error when trying to complete/forward work item and error in msmp approval method when approving request.
In the attachments, you will find the post installation guide for GRC AC 10.0
Hope this helps you.
Regards,
Rakesh Ram M
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Chris,
Unfortunately the document is not found in the AC 10.0 Post Installation Link.
The following activities are performed as part of AC post installation
1. BC Set activation using SCPR20 transaction
2. Creation of Connectors
3. Maintain Connectors and Connection Types
4. Maintain Connection Settings
5. Maintain Configuration Settings
6. Maintain Connector Settings
7. Maintain mapping for actions and connector groups
8. Running the sync jobs
For detailed explanation on these activities you can refer the IMG documentation beside each SPRO config nodes.
Let us know if you need any other details.
Thanks
Regards,
Manju